Perhitungan Ulang Rencana Anggaran Biaya (RAB) dan Time Schedule pada Pembangunan Gedung Corner Cafe and Bakery

Akbar, Zikra Rahmatul (2023) Perhitungan Ulang Rencana Anggaran Biaya (RAB) dan Time Schedule pada Pembangunan Gedung Corner Cafe and Bakery. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
TA-4103201343-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (195kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
TA-4103201343-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (419kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
TA-4103201343-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (186kB) | Preview
[img] Text (Full Text)
TA-4103201343-Full text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (49MB)

Abstract

The success of a project can be measured in terms of efficient cost and time management. Budget plan (RAB) is a crucial phase in the planning process, aimed at estimating the costs to be incurred during the project. To analyze the project's duration, a well-structured time schedule is essential to ensure the project proceeds smoothly. Therefore, this research involves a recalculation of the budget plan (RAB) and time schedule for the construction of the Corner Cafe and Bakery building located on Jl. Antara, Bengkalis, Riau. The island location of the building serves as a motivation for selecting it as the focus of this study. This commercial building, employing a newly constructed WF steel structure, was completed in 2020. The recalculations are performed using the Unit Price Analysis (AHSP) according to Regulation of the Minister of Public Works and Public Housing (Permen PU) No. 1 of 2022. Additionally, the list of regional unit price for labor and materials in Bengkalis in the year 2022 is used as a reference for RAB preparation. The S-curve is employed to analyze the planned work duration. The cost estimation for the construction of the Corner Cafe building amounts to Rp 4.769.952.000,00 with a projected work duration of 202 days.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGunawan, Gunawangunawan@polbeng.ac.idNIDN1024027702
Thesis advisorUNSPECIFIEDUNSPECIFIEDUNSPECIFIED
Uncontrolled Keywords: Budget Plan, RAB, Time Schedule, Corner Cafe, AHSP.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 30 Aug 2023 21:32
Last Modified: 17 Jul 2024 03:03
URI: http://eprints.polbeng.ac.id/id/eprint/10260

Actions (login required)

View Item View Item