Yani, Sutri (2023) Analisis Perhitungan Quantity Take Off Menggunakan Metode BIM (Allplan) Pekerjaan Struktur Beton Dan Baja Tulangan (Studi Kasus : Proyek Pembangunan Jembatan Balok I Sungai Raya Desa Pematang Duku Kec.Bengkalis). Undergraduate thesis, Politeknik Negri Bengkalis.
This is the latest version of this item.
Text (Abstract)
SKRIPSI - 4204191264 - Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Non-commercial Share Alike. Download (37kB) |
|
Text (Bab I Pendahuluan)
SKRIPSI - 4204191264 - BAB I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (44kB) |
|
Text (Daftar pustaka)
SKRIPSI - 4204191264 - Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (31kB) |
|
Text (Full Text)
SKRIPSI - 4204191264 - Full Text..pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (19MB) | Request a copy |
Abstract
The calculation of work volume (quantity taken off) mostly uses conventional methods which in fact require a lot of time and labor. To reduce the amount of labor and streamline time, there are other ways that can be used, one of which is by using the Building Information Modeling (BIM) method. In this research, the author compares the results of the calculation of the volume of concrete and reinforcement between conventional methods and Building information Modeling (BIM) methods using Allplan software, to find out how much difference the resulting volume makes. The author analyzes the volume of work of concrete structural elements and reinforcement in the project of Bridge Construction Beam I Sungai Pematang Duku Kec. Bengkalis. After an in-depth analysis of the calculation of the volume of concrete using Allplan software has a difference of 42% from the calculations carried out by conventional methods, and for the volume of reinforcement as a whole get a difference of 68,78%. Based on the results of this analysis, the use of Allplan in calculating the volume of concrete and reinforcement produces accurate results. Service providers can use Allplan to benefit in terms of time savings and the use of human resources (HR).
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Building Information Modeling, Allplan, Quantity Take Off,Volume of concrete and reinforcement. | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum |
||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | D4 TPJJ | ||||||||
Date Deposited: | 11 Sep 2023 15:14 | ||||||||
Last Modified: | 11 Sep 2023 15:14 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/10584 |
Available Versions of this Item
- Analisis Perhitungan Quantity Take Off Menggunakan Metode BIM (Allplan) Pekerjaan Struktur Beton Dan Baja Tulangan (Studi Kasus : Proyek Pembangunan Jembatan Balok I Sungai Raya Desa Pematang Duku Kec.Bengkalis). (deposited 11 Sep 2023 15:14) [Currently Displayed]
Actions (login required)
View Item |