Analisis Perhitungan Quantity Take Off Menggunakan Metode Bim (Allplan) Pekerjaan Struktur Beton Dan Baja Tulangan (Studi Kasus: Proyek Pembangunan Jembatan Slab on Pile Sungai Raya Desa Pematang Duku Kec. Bengkalis)

Setiawan, Putra (2023) Analisis Perhitungan Quantity Take Off Menggunakan Metode Bim (Allplan) Pekerjaan Struktur Beton Dan Baja Tulangan (Studi Kasus: Proyek Pembangunan Jembatan Slab on Pile Sungai Raya Desa Pematang Duku Kec. Bengkalis). Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
Skripsi - 4204191238 - Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (12kB) | Preview
[img]
Preview
Text (Bab 1 Pendahuluan)
Skripsi - 4204191238 - Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (15kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
Skripsi - 4204191238 - Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (6kB) | Preview
[img] Text (Full Text)
Skripsi - 4204191238 - Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB) | Request a copy

Abstract

The calculation of work volume (quantity taken off) mostly uses conventional methods which in fact require a lot of time and labor. To reduce the amount of labor and streamline time, there are other ways that can be used, one of which is by using the Building Information Modeling (BIM) method. In this research, the author compares the results of the calculation of the volume of concrete and reinforcement between conventional methods and Building Information Modeling (BIM) methods using Allplan software, to find out how much difference the resulting volume makes. The author analyzes the volume of work of concrete structural elements and reinforcement in the project of Bridge Construction Beam I Sungai Pematang Duku Kec. Bengkalis. After an in-depth analysis of the volume calculation using Allplan software has a difference of 3% from the calculations carried out by conventional methods, this is because Allplan 2023 has not been able to calculate the reinforcement overlap automatically on the main reinforcement. Based on the results of this analysis, the use of Allplan in calculating the volume of concrete and reinforcement produces accurate results. Service providers can use Allplan to benefit in terms of time savings and the use of human resources (HR).

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorEnda, Dedidedienda05@gmail.comNIDN1009078502
Uncontrolled Keywords: Building Information Modeling, Allplan, Quantity Take Off,Volume of concrete and reinforcement.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ
Date Deposited: 13 Sep 2023 15:36
Last Modified: 13 Sep 2023 15:36
URI: http://eprints.polbeng.ac.id/id/eprint/10708

Actions (login required)

View Item View Item