Analisis Kinerja Alat Berat Pada Pekerjaan Perkerasan Berbutir (Kelas B) Di Proyek Jalan Perkerasan Rigid Studi Kasus (Jalan Gajah Mada Menuju Kec. Pingir)

Sari, Kurnia (2023) Analisis Kinerja Alat Berat Pada Pekerjaan Perkerasan Berbutir (Kelas B) Di Proyek Jalan Perkerasan Rigid Studi Kasus (Jalan Gajah Mada Menuju Kec. Pingir). Diploma thesis, Politeknik Negeri Bengkalis.

This is the latest version of this item.

[img] Text (Abstract)
TA-4204191272-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (10kB)
[img] Text (BAB I)
TA-4204191272-BAB I.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (131kB)
[img] Text (Daftar Pustaka)
TA-4204191272-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (8kB)
[img] Text (Full Text)
TA-4204191272-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB)

Abstract

pavement is a pavement layer that is located between layers of subgrade and vehicle wheels that function to provide services to transportion facilities, expected during the service period no significant damage occurred. Coasting materials and materials road pavement is aggregate as the main influential material on the carrying capacity of the road surface layer ad asphalt as a material aggregate binder so that the hardness layer is airtight. Aggregate is the main component of the road pavement layer viz ranging from 90-95% by weight percentage. Support and The stability of the road surface layer is determaned from the properties, grain shape, and aggregate gradition.Completion of a work project certainly requires selection and determanation of the composition of heavy equipment depending on the characteristics of each tool and terrain conditions. The data analysis method used is an analytical description consisting of data collection techniques and final project plans. Based on the analysis results obtained, Productivity of heavy equipment Wheel loader perhour is 7,793 m3/hours and for day is 62,344 m3/day, Productivity for Dump truck is 7,335 m3/hours and for day is58,68 m3/day, Productivity from Motor grader is 5,455 m3/hours and for day is 43,648m3/day, ProductivityVibratory roller is 5,832 m3/hours and for day is 46,656 m3/day,Productivity for the Water tank of 4,780 m 3/hours and 38,240 m3/day. Keywords : heavy equipment, granulated pavement, productivity

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorTifani, Efanefantifani@gmail.comNIDN1004038303
Uncontrolled Keywords: alat berat, perkerasan berbutir, produktivitas
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ
Date Deposited: 05 Oct 2023 09:34
Last Modified: 05 Oct 2023 09:34
URI: http://eprints.polbeng.ac.id/id/eprint/11003

Available Versions of this Item

Actions (login required)

View Item View Item