Yanti, Helmi Indra (2020) Perbandingan Perencanaan Tebal Perkerasan Kaku Menggunakan metode Bina Marga 2003 (Pd T14-2003) Dan Bina Marga 2017 (Manual Desain Perkerasan Revisi September) (Studi Kasus: Jalan Subrantas, Desa Sukardjo Mesim, Rupat). Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
16. SKRIPSI-4204161115-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (14kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2. SKRIPSI-4204161115-BAB I.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (222kB) | Preview |
|
|
Text (Daftar Pustaka)
7. SKRIPSI-4204161115-DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (11kB) | Preview |
|
Text (Full Text)
15. SKRIPSI-4204161115-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (22MB) |
Abstract
At this time a lot thick planning of rigid pavement using Bina Marga 2003 method, where the Bina Marga commonly used by planners is plotting the rigid pavement thickness. On the street Subrantas pavement planning using the old. The current road condittions are not suitable for traffic acces. With current conditions, the Bengkalis regency goverment is trying to improve the road by replanning it into a shaft road, where this road is access to the tourist of Rupat Island, namely Ketapang beach and Tanjung Lapin area the value will grow. For thick pavement planning rules, there is the latest clan development. So, the author wants to plan the thickness of the pavement using the Bina Marga 2003 with the Bina Marga 2017. Where the results will be compared between the two methods.The planning of rigid pavement with CBR 3 % and the CBR of effective 20% by the concrete quality K-250 based on Bina Marga 2003 method The result showed that as thick as 17 cm with longitudinal reinforcement is used 8 mm in diameter spacing 25 cm, and transverse reinforcement is used 8 mm in diameter, spacing 25 cm with budget plan 9,702,030,000.00. While to Bina Marga 2017 in get thickness 17 cm with longitudinal reinforcement is used 8 mm in diameter, spacing 25 cm and transverse reinforcement is used 8 mm in diameter, spacing 25 cm with budget plan Rp. 10,392,470,000.00.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Rigid Pavement, Bina Marga 2003, Bina Marga 2017 | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | Editor Perpustakaan | ||||||||
Date Deposited: | 10 Mar 2021 15:16 | ||||||||
Last Modified: | 10 Mar 2021 15:16 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/122 |
Actions (login required)
View Item |