LAPORAN KERJA PRAKTEK (KP) PT THE FAR EAST THE 2 X 30 MW POWER PLANT EPC PROJECT IN DUMAI SDS 2

Syaputra, Muhammad Aidil Syaputra (2023) LAPORAN KERJA PRAKTEK (KP) PT THE FAR EAST THE 2 X 30 MW POWER PLANT EPC PROJECT IN DUMAI SDS 2. [Experiment] (Unpublished)

[img]
Preview
Text (COVER-DAFTAR ISI)
COVER-DAFTAR ISI.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (610kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (509kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (253kB) | Preview
[img]
Preview
Text (FULL TEXT)
FULL TEXT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (7MB) | Preview
Item Type: Experiment
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGuswandi, Guswandiguswandi@polbeng.ac.idNIDN1018088001
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > LAPORAN KERJA PRAKTEK
Depositing User: Teknik Sipil D3
Date Deposited: 25 Mar 2024 15:41
Last Modified: 25 Mar 2024 15:41
URI: http://eprints.polbeng.ac.id/id/eprint/12397

Actions (login required)

View Item View Item