Fauzi, Ikhwan (2024) Implementasi Building Information Modelling (BIM) 5d pada Proyek Gedung Auditorium Stie Syariah Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.
Text (Abstract)
1. TA-4103211430-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (583kB) |
|
Text (Bab I Pendahuluan)
2. TA-4103211430-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (695kB) |
|
Text (Daftar Pustaka)
3. TA-4103211430-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (284kB) |
|
Text (Full Text)
4. TA-4103211430-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (54MB) | Request a copy |
Abstract
BIM is an innovative form of technological development in the construction building. BIM offers higher efficiency in planning through data integration, better visualization, the ability to detect problems faster than conventional methods. Therefore, BIM is superior to Conventional methods so this research aims to apply technological developments in the field of construction, namely Building Information Modeling (BIM) in the STIE Syariah Bengkalis Auditorium Building project. BIM 5D is a BIM dimension that includes 3D modeling of building models, scheduling of work time and estimation of construction project costs that can be integrated simultaneously. This research methodology includes 3D modeling of buildings using Autodesk Revit, project scheduling using Microsoft Project, and visual simulation of buildings using Autodesk Navisworks. The data used is Shop Drawing data from the STIE Syariah Bengkalis Auditorium Building. The results of this study indicate that the application of BIM 5D which is integrated in each application used is more efficient in modeling the STIE Syariah Bengkalis Auditorium Building building into a 3D model. Quantity Take Off calculations with the BIM method have an average difference of 0.80 m³ for concrete calculations and an average difference of 33.23 Kg for reinforcement calculations. Can identify collisions between models that have been made, more structured project scheduling and implementation simulation.
Item Type: | Thesis (Diploma) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Gedung Auditorium, Building Information Modelling (BIM), Autodesk Revit, Microsoft Project, Autodesk Navisworks | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||
Depositing User: | Teknik Sipil D3 | ||||||||
Date Deposited: | 22 Aug 2024 09:55 | ||||||||
Last Modified: | 22 Aug 2024 09:55 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/13223 |
Actions (login required)
View Item |