Winardi, Yulius (2024) Penerapan Metode Building Information Modeling ( BIM ) Revit Struktur Pada QTO (Quantity Take Off) Pekerjaan Struktural Jembatan Girder ( Studi Kasus : Jembatan Sungai Seliau Pematang Duku Kec. Bengkalis ). Undergraduate thesis, Politeknik Negeri Bengkalis.
Text (Abstract)
1. SKRIPSI-4204201369-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Non-commercial Share Alike. Download (9kB) |
|
Text (Bab I Pendahuluan)
2. SKRIPSI-4204201369-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (20kB) |
|
Text (Daftar Pustaka)
3. SKRIPSI-4204201369-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (9kB) |
|
Text (Full Text)
4. SKRIPSI-4204201369-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (14MB) |
Abstract
Before the use of computers for building visual design, planners used drafting tables, which had many limitations. With technological advancements, Computer-Aided Design (CAD) emerged as a more efficient solution, allowing design changes without the need to redraw. As technology progressed, it demanded higher efficiency, leading to the development of Building Information Modeling (BIM). BIM enables the simulation of construction projects in accurate 3D forms, aided by software such as Autodesk Revit. Revit integrates architectural, structural, mechanical, electrical, and plumbing (MEP) designs within a single file, facilitating better communication among disciplines and detailed analysis. This research focuses on modeling and applying BIM using Autodesk Revit Structure 2020, with initial design data obtained from the Public Works and Spatial Planning Office of Bengkalis Regency. It then calculates the quantity take-off based on the volumes derived from the bridge modeling. From the design work carried out, a 3D structural model of the Seliau River Bridge in Pematang Duku Village, Bengkalis District, was produced, resulting in quantity take-off volumes of 139.04 m³ of concrete, 38.946,14 kg of reinforcement, and 281.794 m³ of formwork.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | BIM, Autodesk Revit 2020, Quantity Take Off, Structural Work | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | D4 TPJJ A 2024 | ||||||||
Date Deposited: | 27 Aug 2024 07:50 | ||||||||
Last Modified: | 27 Aug 2024 07:50 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/13942 |
Actions (login required)
View Item |