Pengaplikasian Sistem Informasi Geografis (SIG) Terhadap Analisa Kerusakan Jalan Pada Permukaan Perkerasan Lentur Menggunakan Metode Bina Marga

Akmal, Rahmat Hidayatu (2024) Pengaplikasian Sistem Informasi Geografis (SIG) Terhadap Analisa Kerusakan Jalan Pada Permukaan Perkerasan Lentur Menggunakan Metode Bina Marga. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstract)
TEXT (ABSTRACT).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (620kB)
[img] Text (Bab I Pendahuluan)
TEXT (BAB I PENDAHULUAN).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (576kB)
[img] Text (Daftar Pustaka)
TEXT (DAFTAR PUSTAKA).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (537kB)
[img] Text (Full Text)
TEXT (FULL TEXT SKRIPSI).pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (13MB) | Request a copy

Abstract

Pelintung road section (Bengkalis Regency boundary) – Sepahat - Sei. Pakning Sta. 42+000 – Sta 52+560 is a cross-provincial road which is a road connecting Bengkalis Regency and Dumai City as well as being an access road for local residents to support the economy, so the quality of the road on this road section is very important to maintain so that the road remains in good condition and comfortable when passed by the driver. This research aims to determine the value of road conditions on the Pelintung road section (Bengkalis Regency boundary) – Sepahat - Sei. Pakning STA (42+000 – 52+560) so that it can determine the type of road maintenance program. The methods used in this research are the Road Condition Survey (RCS), Road Condition Index (RCI), International Roughness Index (IRI), Surface Distress Index (SDI), Bina Marga 1990 and Geographic Information Systems (GIS) methods to analyze and map road damage. Based on road conditions, there are types of repair actions that will be carried out, namely routine maintenance of 79 sta or 7.86 km long, periodic maintenance of 10 sta or 1 km long, and road improvements totaling 17 sta or 1.7 km long, and based on the implementation results map. road damage data using ArcGIS, there are 295 damage points consisting of Cracks (199), Holes & Patches (64), Wheel Marks/Grooves (8), Subsidence/Subside (14), and Surface Roughness (10) with a total road length 10.56 km.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorLizar, LizarLizar@polbeng.ac.idNIDN0024078703
Uncontrolled Keywords: Road Damage, RCS, RCI, IRI, SDI, Bina Marga, GIS
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > LAPORAN KERJA PRAKTEK
Depositing User: D4 TPJJ A 2024
Date Deposited: 28 Aug 2024 13:59
Last Modified: 28 Aug 2024 13:59
URI: http://eprints.polbeng.ac.id/id/eprint/14118

Actions (login required)

View Item View Item