Perencanaan Timeschedule Denganmenggunakan Software Microsoft Project (Study kasus Gedung Poliklinik 2 Lantai Rupat, Riau)

Siahaan, Novi Rouli (2024) Perencanaan Timeschedule Denganmenggunakan Software Microsoft Project (Study kasus Gedung Poliklinik 2 Lantai Rupat, Riau). Diploma thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstrak)
TA NOVITerbaru Abstrak 1.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (133kB)
[img] Text (Bab I Pendahuluan)
TA NOVI Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (110kB)
[img] Text (Daftar Pustaka)
TA NOVI Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (110kB)
[img] Text (Full Text)
TA NOVI Full Text Terbaru 1.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (4MB)

Abstract

This final assignment aims to analyze the scheduling of a 2-story polyclinic building construction project in North Rupat, Bengkalis Regency, Riau using the Precedence Diagram Method (PDM) with the help of Microsoft Project software. The main objective of the research is to determine the duration of the project and identify the critical path and activities that have a lead time (float). The research methodology includes collecting secondary data in the form of a project planning schedule in the form of an S curve, data processing using Microsoft Project, and analysis of the results. The analysis stages include creating a PDM network and identifying critical paths. The research results show that the total project duration after rescheduling is 151 calendar days, shorter than the initial planning duration of 180 calendar days. Identified 67 critical activities that form the critical path of the project, covering various jobs ranging from field cleaning to making concrete structures. This research contributes to optimizing construction project scheduling and can be a reference for managing similar projects in the future.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGunawan, Gunawangunawan240277@gmail.comNIDN1023117501
Uncontrolled Keywords: Penjadwalan,Microsoft Project, Precedence PDM,Jalur Kritis
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 28 Aug 2024 02:49
Last Modified: 28 Aug 2024 02:49
URI: http://eprints.polbeng.ac.id/id/eprint/14240

Actions (login required)

View Item View Item