Ardianto, Eriko (2024) Analisa Dan Rancang Bangun Alat Monitoring Keseimbangan Beban 3 Fasa Pada Jaringan Overheat (DL 7901TT) Berbasis Internet Of Things. Undergraduate thesis, Politeknik Negeri Bengkalis.
Text (Abstract)
1.TA-5304201352-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (9kB) |
|
Text (Bab l Pendahuluan)
2.TA-5304201352-Bab l Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (329kB) |
|
Text (Daftar Pustaka)
3.TA-5304201352-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (10kB) |
|
Text (Full Text)
4.TA-5304201352-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (12MB) | Request a copy |
Abstract
A 3-phase system can experience load balance between phases if the load used is also balanced between the three phases R, S and T. To meet the electrical power needs, there is a distribution of loads which is initially evenly distributed but due to the asymmetry of the ignition times of these loads This creates a load imbalance that impacts the supply of electrical power. This load imbalance between each phase causes current to flow in the neutral. This research uses 4 PZEM-004T sensors and 8 D Lorenzo DL 7901TT input and output monitor modules as readers of current and voltage values for each of the R, S, T and Neutral phases. The ESP8266 NodeMCU is used as a microcontroller which will process sensor reading data displayed in the Blynk application installed in the design box. Based on the IEEE 446-1995 standard, the permitted load unbalance percentage is 5% to 20% per phase. After testing 3 times, the smallest percentage was on the PZEM-004T sensor where the percentage in the 1st experiment was 31.1%, the 2nd experiment was 31.02%, and the 3rd experiment was 31.31% and the percentage comparison The highest analysis imbalance was in the measuring instrument where in the 1st experiment it was 58%, in the 2nd experiment 49%, and in the 3rd experiment it was 50.6%. Keywords: Load Balance, PZEM 004-T, Blynk, Monitor Module
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Keywords: Load Balance, PZEM 004-T, Blynk, Monitor Module | ||||||||
Subjects: | 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 451 Teknik Elektro | ||||||||
Divisions: | Jurusan Teknik Elektro > Sarjana Terapan Teknik Listrik > TUGAS AKHIR | ||||||||
Depositing User: | D4 Teknik Listrik B | ||||||||
Date Deposited: | 27 Aug 2024 15:36 | ||||||||
Last Modified: | 05 Sep 2024 04:02 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/14262 |
Actions (login required)
View Item |