Analisis Potensi Bahaya K3 Menggunakan Metode Hirarc Pada Pembangunan Rumah Sakit Pratama – Pulau Rupat

Saputra, Denis (2024) Analisis Potensi Bahaya K3 Menggunakan Metode Hirarc Pada Pembangunan Rumah Sakit Pratama – Pulau Rupat. Diploma thesis, POLITEKNIK NEGERI BENGKALIS.

[img] Text (Abstract)
1. TA-4103211372-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (14kB)
[img] Text (Bab I Pendahuluan)
2. TA-4103211372-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (134kB)
[img] Text (Daftar Pustaka)
3. TA-4103211372-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (123kB)
[img] Text (Full Text)
4. TA-4103211372-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (6MB)

Abstract

One of the projects that is currently developing is the Pratama Island Rupat Hospital construction project. In 2023, there are buildings that have been submitted to the Bengkalis Regency Government, Riau Province, especially for building permits for Pratama Pulau Rupat Hospital. One effort to overcome work accidents is to analyze the risks that may occur or can be called risk analysis.The process used in risk analysis in this research is Hazard Identification, Risk Assessment and Risk Control (HIRARC). HIRARC is an effort to prevent and reduce the potential for work accidents. This research aims to identify hazards, analyze risks, and provide occupational safety and health (K3) risk control. This research was carried out using literature study, distribution of questionnaires and interviews. In the identification and analysis process using the literature Guidelines for Hazard Identification, Risk Assessment and Risk Control From the research results, 85% of workers felt comfortable/at home at work and found that the environment was running well in the North Rupat Hospital construction project. This research concluded that several aspects needed to be improved, especially in the formwork and casting work process, the location of the steel reinforcement work was at a height. . The dominant risk variables that may occur include materials almost falling on tools/facilities/workers, and workers being scratched by reinforcement during work, stepping on nails, etc. Risk control that can be carried out is supervision using personal protective equipment (PPE) such as installing guardrails, horizontal and vertical safety nets, K3 signs, supervision by K3 staff for each job, and using PPE to improve work safety.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorSastra, Marhadimarhadi@polbeng.ac.idNIDN198903142015041001
Uncontrolled Keywords: risk analysis, occupational health and safety K3, Construction of the Pratama Rupat Island Hospital
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 30 Aug 2024 07:49
Last Modified: 30 Aug 2024 07:49
URI: http://eprints.polbeng.ac.id/id/eprint/14472

Actions (login required)

View Item View Item