Perencanaan Ulang Rusunawa Polbeng Menggunakan Beban Gempa Berdasarkan Perencanaan Ulang Struktur Kolom Gedung Rusunawa Polbeng Menggunakan Beban Gempa Berdasarkan Sni 1726:2012 Dan Sni Beton 2847 Gedung Rusunawa Polbeng Menggunakan Beban Gempa Sni 1726:2012 Dan Sni Beton 2847:2013

Agustin, Dila (2020) Perencanaan Ulang Rusunawa Polbeng Menggunakan Beban Gempa Berdasarkan Perencanaan Ulang Struktur Kolom Gedung Rusunawa Polbeng Menggunakan Beban Gempa Berdasarkan Sni 1726:2012 Dan Sni Beton 2847 Gedung Rusunawa Polbeng Menggunakan Beban Gempa Sni 1726:2012 Dan Sni Beton 2847:2013. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
11. TA-4103171167-ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (511kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4103171167-BAB I.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (744kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
7. TA-4103171167-DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (528kB) | Preview
[img] Text (Full Text)
10. TA-4103171167-FULL TEXT.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (13MB) | Request a copy

Abstract

Polbeng Rusunawa Building is a flat specially made for students which consists of 3 floors. In planning the structure of this building is designed to be strong against the loading that occurs so that the building meets the requirements for strength and structural rigidity. The redesign of the Polbeng Rusunawa building for structural calculations refers to the Indonesian National Standard 2847: 2013 and the Indonesian National Standard 1727: 2013 and the structural modeling refers to the Indonesian National Standard 1726: 2012 analyzed using SAP2000 V.14. From the calculation results on the structure obtained reinforced concrete structure with column dimensions on K1 using dimensions of 400 × 400 mm, but the reinforcement used is less 10D19 main reinforcement and stirrup reinforcement Ø10-150 mm. while for K2 still with the same dimensions 300 × 300 mm by using the main reinforcement 8D16 and stirrup reinforcement Ø10-120 mm

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorJauhari, Zev AlUNSPECIFIEDNIDN0028019401
Uncontrolled Keywords: Planning, Upper Structure, SAP2000 Dimensions, Reinforcement
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Editor Perpustakaan
Date Deposited: 22 Mar 2021 15:23
Last Modified: 22 Mar 2021 15:23
URI: http://eprints.polbeng.ac.id/id/eprint/145

Actions (login required)

View Item View Item