Perhitungan Quantity Take Menggunakan BIM (Revit) Pada Pembangunan Gedung Kantor Lembaga Adat Kampar

Nurbaiti, Nurbaiti (2024) Perhitungan Quantity Take Menggunakan BIM (Revit) Pada Pembangunan Gedung Kantor Lembaga Adat Kampar. Diploma thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstrak)
1. TA-4103211428-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (276kB)
[img] Text (BAB I Pendahuluan)
2. TA-4103211428-BAB I Pendahulu.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (240kB)
[img] Text (Daftar Pustaka)
3. TA -4103211428-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (227kB)
[img] Text (Full Text)
4. TA-4103211428-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (14MB) | Request a copy

Abstract

One technology that can support the construction process is building information modeling (BIM). The aim of this research is to compare and analyze the difference in volume calculations using conventional methods and the BIM method. This research discusses the comparative calculation of the structural volume of a 2-story building starting from the foundation, beams, columns. The method used is to compare the concrete volume between conventional method calculations and the BIM method. The conventional method is carried out by calculating manually using AutoCAD while the BIM method is carried out using Autodesk Revit. BIM method calculations are more accurate and can minimize the occurrence of errors. Based on this research, the volume comparison value between conventional methods and BIM methods for foundation structures is 0%, sloof beam structures are 0%, pedestal column structures are 1%, column structures are 4%. %, and the total volume of concrete and reinforcement is 24%

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorArdita, Julijuliardita@polbeng.ac.idNIDN0013078504
Thesis advisorEnda, Dedidedienda05@gmail.comNIDN1009078502
Uncontrolled Keywords: Quantity Take Off, Building Information Modeling, BIM Revit, Construction of the Kampar Traditional Institution Office Building
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 31 Aug 2024 13:50
Last Modified: 31 Aug 2024 13:50
URI: http://eprints.polbeng.ac.id/id/eprint/14514

Actions (login required)

View Item View Item