Aguslian, Nofal (2024) Perbandingan Volume Pekerjaan Pembangunan Pasar Agropolitan Menggunakan Autodesk Revit dan Boq Pelaksanaan. Diploma thesis, Politeknik Negeri Bengkalis.
Text (Abstract)
TA-4103211385-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (11kB) |
|
Text (Bab I Pendahuluan)
TA-4103211385-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (95kB) |
|
Text (Daftar Pustaka)
TA-4103211385-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (5kB) |
|
Text (Full Text)
TA-4103211385-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (14MB) | Request a copy |
Abstract
In the world of construction, the emergence of digital technology development is quite rapid so that it has an impact on accelerating infrastructure development to be more efficient and productive, one of which is Building Information Modeling (BIM), one of the software in BIM, namely Autodesk Revit. The purpose of this study is to compare and analyze the difference in the calculation of work volume using the manual method with the BIM Revit method. Calculations using the BIM Revit method are more accurate and can minimize human error. Therefore, it can be concluded that the results of the calculation of concrete volume and ironing work using the manual method are greater than the calculation using the BIM Revit method. Based on this study, it was obtained that the difference in concrete volume comparison using the manual method using the BIM Revit method in Bore pile foundation work was 0.1%, pile cap was 0%, sloof beam work was 5.5%, floor plate work was 7.8%, column work was 0.0%, floor beam work was 2.94%, light steel truss work was 1.91%, and roof work was 0.48%. And for the difference in the comparison of ironing work on Bore pile is 0.5%, Pile cap is 17%, sloof work is 0.3%, floor plate work is 4.12%, column work is 0.7%, Beam work is 0.15%.
Item Type: | Thesis (Diploma) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Building Information Modelling (BIM), Autodesk Revit 2022, Quantity Take Off, Conventional | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||
Depositing User: | Teknik Sipil D3 | ||||||||
Date Deposited: | 02 Sep 2024 04:31 | ||||||||
Last Modified: | 02 Sep 2024 04:31 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/14632 |
Actions (login required)
View Item |