Maulana, Andri Septiyan (2024) Perencanaan Anggaran Biaya (RAB) dan Time Schedule pada Pembangunan Rumah Tinggal 2 Lantai Dengan Luas 2500 M 2. Diploma thesis, Politeknik Negeri Bengkalis.
Text (Abstract)
TA-4103211373-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (136kB) |
|
Text (Bab I Pendahuluan)
TA-4103211373-Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (161kB) |
|
Text (Daftar Pustaka)
TA-4103211373-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (218kB) |
|
Text (Full Text)
TA-4103211373-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (16MB) |
Abstract
The Construction projects are something that always goes hand in hand with developments over time, because the more development there is in an area, the more advanced that area is. Especially in Kampar district, the location is starting to develop because the population there is increasing. Project achievements can be measured in terms of cost and time efficiency. The cost budget plan (RAB) is a stage carried out at the planning stage. Making this RAB aims to analyze the duration of a project, it is necessary to make a thorough time schedule so that the project can run well and smoothly. In this research, we examine how to make a budget plan (RAB) for the construction of a 2-story residential house and the time schedule with the total costs obtained from the results of making a budget plan of IDR 6,048,039,000.00 (Six Billion Forty- Eight Million Thirty-Nine Ribų Rupiah) with a work duration of 204 days. By having a budget plan, here you can find out what work is done every day.
Item Type: | Thesis (Diploma) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||||||
Uncontrolled Keywords: | Cost Budget Plan (RAB), Time Schedule, Construction of 2-storey residential houses,Construction planning | ||||||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||||||
Depositing User: | Teknik Sipil D3 | ||||||||||||
Date Deposited: | 02 Sep 2024 04:28 | ||||||||||||
Last Modified: | 02 Sep 2024 04:28 | ||||||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/14633 |
Actions (login required)
View Item |