Animasi Metode Pelaksanaan Pembangunan Gedung Kuliah Tepadu 4 Politeknik Negeri Bengkalis

Sapitra, Sapitra (2021) Animasi Metode Pelaksanaan Pembangunan Gedung Kuliah Tepadu 4 Politeknik Negeri Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-4103181228-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4103181228-BAB 1 PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4103181228-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (3MB) | Preview
[img] Text (Full Text)
4. TA-4103181228-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (14MB) | Request a copy

Abstract

Bengkalis State Polytechnic has a vision to become a vocational college with national and international standards, to achieve these standards, supporting facilities and infrastructure are needed, one of which is an integrated lecture building. In the construction of the Integrated Lecture Building, an implementation method is needed. So that the delivery of the implementation method is easy to understand, the implementation method is delivered through 3D visualization in the form of 3D animation. In this implementation method using precast concrete implementation methods for pile foundations andmethods cast in situ for structural concrete work which includes pilecaps, sloof, columns, beams and plates, while the roof structure using lightweight steel rafts is in place. The results of this research are formed in a 3D animation video, the stages of implementing the integrated lecture building method 4 Bengkalis State Polytechnic which include site cleaning, mobilization, measurement and installation of bouwplank, pile work, pile cap work, sloof work, 1st floor column work, beam work and 2nd floor slab, 2nd floor column work, 3rd floor beam and slab work, 3rd floor column work, concrete beam and dak work, ladder work, and roof work.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorEnda, Dedidedienda05@gmail.comNIDN1009078502
Thesis advisorRahman, Bobybobirahman@gmail.comNIDK1200170
Uncontrolled Keywords: Building, Implementation Method, 3D Animation
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Users 70 not found.
Date Deposited: 11 Sep 2021 12:55
Last Modified: 13 Sep 2021 13:59
URI: http://eprints.polbeng.ac.id/id/eprint/1529

Actions (login required)

View Item View Item