Perhitungan Quantity Take Off Menggunakan Bim Revit Pada Pembangunan Mall Pelayanan Publik Kampar

Santika, Dela Maya (2024) Perhitungan Quantity Take Off Menggunakan Bim Revit Pada Pembangunan Mall Pelayanan Publik Kampar. Diploma thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstrak)
1. TA-4103211429-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (245kB)
[img] Text (Pendahuluan)
2. TA-4103211429-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (226kB)
[img] Text (Daftar pustaka)
3. TA-4103211429-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (192kB)
[img] Text (Full text)
4. TA-4103211429-Full Text.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (11MB)

Abstract

In calculating the volume of work, there are several methods that can be used, one of which is manually or what is called the conventional method. In calculating QTO, the conventional method often occurs human error in the form of errors in calculating the volume of work and is inaccurate. This study aims to examine the comparison of theresults of the QTO calculation of Building Information Modeling (BIM) with the QTO calculation of the conventional method on the structural work of the Kampar Public Service Mall Building. The conventional method is carried out by calculating manually using AutoCAD while the BIM method is carried out using Autodesk Revit. This study is to model the building structure using the Revit 2022 application with reference to the detailed engineering drawing. The results of this modeling are the volume of work. From the results of this study, that the work items that have a fairly large difference such as the pedestal column work of 55%, where conventional calculations have agreater value than the results of the BIM-based Quantity Take Off

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorBasir, Noerdinnoerbas@gmail.comNIDN1031037701
Uncontrolled Keywords: BIM Revit, Mall Development, Quantity Take Off.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 427 Teknik Arsitektur
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 20 Dec 2024 01:50
Last Modified: 20 Dec 2024 01:50
URI: http://eprints.polbeng.ac.id/id/eprint/15477

Actions (login required)

View Item View Item