Analisa Perencanaan Perawatan Untuk Mengurangi Biaya Downtime Pada Unit Mesin Produksi Air Bersih Menggunakan Metode Age Replacement Di Perumda Air Minum Tirta Terubuk Bengkalis

Azizi, Syahrul (2020) Analisa Perencanaan Perawatan Untuk Mengurangi Biaya Downtime Pada Unit Mesin Produksi Air Bersih Menggunakan Metode Age Replacement Di Perumda Air Minum Tirta Terubuk Bengkalis. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstrak)
10. SKRIPSI - 2204161091 - ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (89kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. SKRIPSI - 2204161091 - BAB I.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (25kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
7. SKRIPSI - 2204161091 - DAFTAR PUSTAKA .pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (200kB) | Preview
[img] Text (Full Text)
9. SKRIPSI - 2204161091 - FULL TEXT.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Request a copy

Abstract

The clean water treatment production process is an important element that must operate stably to obtain maximum results, So that it takes good and planned maintenance activities. Including drinking water. Based on the analysis that has been carried out to determine the preventive schedule for the clean water process, an interval of 4 days is determined for the intake process, 30 days for the flocculation process, 30 days for the sedimentation process and 6 days for the determination process. For the distribution process, the determination of this time interval is based on the number of replacements and the time required for repair. The minimization ratio obtained from the data processing process is 0.00629 or 5% for the intake process, 0.00122 or 1% for the flocculation process, 0.00147 or 1% for the distribution process, and 0.00469 or 7% for the process. distribution.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorIndra, Akmalakmalindra@polbeng.ac.idNIDN1012097501
Uncontrolled Keywords: Age Replacement, downtime, optimal maintenance planning and preventive maintenance.
Subjects: 410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 431 Teknik Mesin (dan Ilmu Permesinan Lain)
Divisions: Jurusan Teknik Mesin > Sarjana Terapan Teknik Mesin Produksi dan Perawatan > TUGAS AKHIR
Depositing User: Editor Perpustakaan
Date Deposited: 14 Jun 2021 14:23
Last Modified: 14 Jun 2021 14:23
URI: http://eprints.polbeng.ac.id/id/eprint/333

Actions (login required)

View Item View Item