Perencanaan Ulang Struktur Atas (Balok Dan Kolom) Gedung Rusunawa Politeknik Negeri Bengkalis

Siswaya, Nugraha Tatang (2022) Perencanaan Ulang Struktur Atas (Balok Dan Kolom) Gedung Rusunawa Politeknik Negeri Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-4103191281-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (1MB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4103191281-BAB 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4103191281-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (577kB) | Preview
[img] Text (Full Text)
4. TA-4103191281-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (15MB)

Abstract

Bengkalis State Polytechnic is the only State Polytechnic in Bengkalis, Riau, Indonesia. Currently the Bengkalis State Polytechnic is growing rapidly, this is indicated by the increasing number of students studying at the Polytechnic. The Rusunawa Building is a facility owned by the Bengkalis State Polytechnic which is intended for student accommodation. In the previous planning the Rusunawa Building used the old SNI, namely SNI 1726:2012 (earthquake resistance) and SNI 2847:2013 (structural requirements for buildings), the SNI used in the previous planning was too long and certainly there were still many shortcomings, therefore this building will be re-planned using the latest SNI, namely SNI 1727:2019 (earthquake resistance) SNI 2847:2019 (structural requirements for buildings) on beam and column structures. The modeling of the Rusunawa Building at the Bengkalis State Polytechnic was analyzed using the ETABS and for the planning of reinforcement in beams and columns analyzed using the Special Moment Resistant Frame System (SRPMK). Based on the calculation results obtained a comparison between the initial planning and the new plan, in the initial planning of the exterior beam using dimensions of 250 × 450 mm2 with reinforcement in the support area 4D16 and stirrups D10-100 mm, for the field area using reinforcement 2D16 with stirrups D10-150 mm. While in the new design, the exterior beams use dimensions of 250 × 450 mm2 with reinforcement in the support area 3D16 and stirrups D10-90 mm, for the field area using reinforcement 2D16 with stirrups D10-125 mm. As for the column, in the initial planning column 1 used dimensions of 300 × 400 mm2 with the main reinforcement using 10D16 and stirrup reinforcement D10-100 mm. While in the new plan, column 1 uses dimensions of 400 × 400 mm2 with the main reinforcement using 12D16 and 3D10-100 mm stirrups.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorJauhari, Zev Alzevaljauhari@gmail.comNIDN0028019401
Uncontrolled Keywords: Planning, Upper Structure, Reinforcement, ETABS 2013
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil A
Date Deposited: 30 Aug 2022 15:16
Last Modified: 13 Dec 2022 09:57
URI: http://eprints.polbeng.ac.id/id/eprint/5852

Actions (login required)

View Item View Item