Azizan, Fanni (2022) Pemodelan 3D Bangunan yang Diintegrasikan dengan BIM Menggunakan Aplikasi Foto Udara UAV (Studi Kasus : Wisma Daerah Srimahkota Kabupaten Bengkalis). Diploma thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
TA-4103191251-Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (5MB) | Preview |
|
|
Text (Bab I Pendahuluan)
TA-4103191251-Bab 1 Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (5MB) | Preview |
|
|
Text (Daftar Pustaka)
TA-4103191251-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (5MB) | Preview |
|
Text (Full Text)
TA-4103191251-Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (6MB) |
Abstract
Seeing the development of demand for geospatial information in various fields, methods for conducting mapping activities are also developing. To support survey and mapping activities are Unmanned Aircraft (PTTA) or generally called Unmanned Aerial Vehicles (UAV). Orthophoto is the result of processing aerial photos using three flight paths, namely nadir, oblique and circular with geometry correction from the GCP (Ground Control Point) point obtained from GPS Geodetic. This orthophoto data is used as horizontal accuracy using the RMSE method which refers to the BIG Perka No. 15 of 2014 concerning the geometric accuracy standard of RBI maps. Point Cloud 3D is the result of BIM integration from aerial photos. From the results of Point Cloud BIM integration has calculated RMSExy 0.0834 m and a height ratio of 0.05 and CE accuracy of 0.1265 m which is included in the LOD (Level Of Detail) level 3
Item Type: | Thesis (Diploma) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||||||
Uncontrolled Keywords: | Unmanned Aerial Vehicle (UAV), Ground Control Point (GCP), Building Information Modeling (BIM), LOD (Level Of Detail) | ||||||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum |
||||||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||||||
Depositing User: | D3 Teknik Sipil A | ||||||||||||
Date Deposited: | 27 Aug 2022 21:39 | ||||||||||||
Last Modified: | 27 Aug 2022 21:39 | ||||||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/6068 |
Actions (login required)
View Item |