Perencanaan Drainase Di Jalan Taman Sari Desa Bantan Tua Kecamatan Bantan Kabupaten Bengkalis

Syafwandy, Muhammad Rizky (2022) Perencanaan Drainase Di Jalan Taman Sari Desa Bantan Tua Kecamatan Bantan Kabupaten Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (TA-4103191262-Abstrak)
TA-4103191262-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (488kB) | Preview
[img]
Preview
Text (TA-4103191262-Bab 1)
TA-4103191262-Bab 1.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Preview
[img]
Preview
Text (TA-4103191262-Daftar Pustaka)
TA-4103191262-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (340kB) | Preview
[img] Text (TA-4103191262-Full Text)
TA-4103191262-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (23MB)

Abstract

Existing conditions of unspoiled drainage from the soil cause landslides on the drainage walls and siltation of the drainage, besides that the drainage is still walled in soil overgrown with weeds so that it hinders the flow of water in the drainage, The purpose of this study is to plan a drainage system in the Taman Sari area to reduce or excess water in an area that is easily flooded by rainwater, and several stages of research will be carried out, namely measuring the cross section and long section, drawing the cross section and long section, drawing contour maps, planning the dimensions to be used, and calculating RAB The method used in analyzing the intensity of rainfall using the gumbel distribution and the monobe method with rainfall data obtained from the same system of stations located in the new strait in 2014-2021. Meanwhile, to analyze the rainfall discharge and drainage channel discharge using a rational method, the type of drainage that I chose on Jalan Taman Sari, Bantan Tua Village is the type of Turap, with dimensions, drainage height for one side of the road is 3 m and the height for one side of the resident's land is 2 m, because the width is flat. The average drainage is 1.6 – 1.9 meters and the cross-sectional area that will be used is the highest cross-sectional area from the data that has been carried out in the field research. From the calculation results, the existing capacity of the drainage channel on Jalan Taman Sari, Bantan Tua Village, Bantan District, Bengkalis Regency is Qn = 1.5776 m3/second. Calculation of rainfall discharge is Qch= 0.09403 m3/second. Calculation of channel capacity Qs= 3.600 m3/second. Calculation of the planned discharge QT = 1.6716 m3/second. The calculation of the dimensions of the rectangular drainage channel B = 2 m, h = 1.2 m, and W = 0.774 m. From the dimensions of the planned drainage channel, the calculation of the Budget Plan is carried out to obtain a total cost of Rp. 1,418,022,000.00

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorZulkarnain, Zulkarnainzulkarnaen@polbeng.ac.id0010078402
Uncontrolled Keywords: Keywords: Purpose, Planning, Exsixting Channel, Dimensions, Debit, RAB
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil B
Date Deposited: 02 Sep 2022 17:04
Last Modified: 02 Sep 2022 17:04
URI: http://eprints.polbeng.ac.id/id/eprint/6885

Actions (login required)

View Item View Item