Analisis Life Cycle Cost (LCC) Pada Pembangunan Gedung Rusunawa, Politeknik Negeri Bengkalis

Hasnaldi, Suci Alifia (2022) Analisis Life Cycle Cost (LCC) Pada Pembangunan Gedung Rusunawa, Politeknik Negeri Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA - 4103191286 - ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (208kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.TA - 4103191286 - BAB 1 PENDAHULUAN .pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (222kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.TA - 4103191286 - DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (417kB) | Preview
[img] Text (Full Text)
4. TA - 4103191286 - FULL TEXT .pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (17MB)

Abstract

In a good building construction, planning of the building life cycle cost is very necessary because these costs will affect the estimated cost required for the future of the building itself, which consists of initial costs, operational costs and maintenance and replacement costs. Rusunawa is one of the infrastructure facilities that operate every day. So this study aims to calculate the Life Cycle Cost in a simple rental flat at the Bengkalis State Polytechnic and analyze the feasibility of building investment against the rental price. Based on the results of the study, it was found that the four components used in the preparation of the Life Cycle Cost that occurred from the planning of the Rusunawa building to the economic life of the building for 50 years amounted to Rp. 90,726,533,237.88 with details of the initial fee in the amount of Rp. 11,350,226,158,67, operating costs of Rp. 8,658,302,713.94, maintenance and replacement costs of Rp. Rp.63,745,211,220.60 and the cost of dismantling carried out in the 51st year spent Rp.6,972,793,144.67. As well as the analysis of the investment in the flats on the rental fee set by the manager of Rp.130,000 which is declared unfeasible with an NPV value of <0, the IRR value, <3%, and is declared feasible if the rental fee is set to be Rp. 200,000 so that the NPV value> 0 is Rp.781 .706.423.89.and IRR = 3.2% > MARR 3%.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGunawan, Gunawangunawan@polbeng.ac.idNIDN1024027702
Uncontrolled Keywords: Life Cycle Cost (LCC), Investment Analysis, NPV, IRR
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil A
Date Deposited: 02 Sep 2022 17:40
Last Modified: 07 Sep 2022 09:50
URI: http://eprints.polbeng.ac.id/id/eprint/6928

Actions (login required)

View Item View Item