Faradila, Amy (2022) Penerapan Metode Building Information Modelling (BIM) Pada Pekerjaan Struktural Gedung Kuliah Terpadu II (GKT II) Politeknik Negeri Bengkalis (Penggunaan Autodesk Revit 2020). Diploma thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
TA - 4103191246 - Abstract.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (60kB) | Preview |
|
|
Text (Bab I Pendahuluan)
TA - 4103191246 - Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (176kB) | Preview |
|
|
Text (Daftar Pustaka)
TA - 4103191246 - Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (54kB) | Preview |
|
Text (Full Text)
TA - 4103191246 - Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (34MB) |
Abstract
The rapid development of the construction world in Indonesia raises the need for more efficient and effective supporting technologies. This development resulted in a system known as Building Information Modeling (BIM). BIM is basically a digital platform for creating virtual buildings. Autodesk Revit software is a BIM-based software that helps project documentation more realistically with three-dimensional modeling. In this final project, the author uses Revit software to design the structural part of the building starting with the As Built Drawing data collection stage method and proceeding to modeling structural elements, which will then obtain automatic volume and processing of the Budget Plan (RAB). Based on the results of the research that has been carried out, the results of calculations from Revit in the form of a total volume (QTO) of concrete are 962.75 m3, the total volume of iron is 39.304 m3 and the Budget Plan (RAB) is Rp. 10,395,862.000,00. The use of BIM-based applications in designing a building can simplify the design process, increase the efficiency of time, human resources and subsequent stages.
Item Type: | Thesis (Diploma) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | BIM, Autodesk Revit, Quantity Take Off, CAD. | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||
Depositing User: | D3 Teknik Sipil A | ||||||||
Date Deposited: | 06 Sep 2022 09:22 | ||||||||
Last Modified: | 06 Sep 2022 09:22 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/7008 |
Actions (login required)
View Item |