Animasi 3d Metode Pelaksanaan Jembatan Box Culvert Di Jalan Wonosari Timur Gg. Pinang

Harahap, Yusuf Riski Dany (2022) Animasi 3d Metode Pelaksanaan Jembatan Box Culvert Di Jalan Wonosari Timur Gg. Pinang. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1.TA-4103191250-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (63kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.TA-4103191250-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (87kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.TA-4103191250-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (194kB) | Preview
[img] Text (Full Text)
4.TA-4103191250-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (17MB)

Abstract

The Bengkalis area itself has many bridge constructions that are useful for smooth transportation, one of which is the bridge at gg. Pinang, East Wonosari Village, Bengkalis District, Bengkalis Regency. Currently, there are several problems with the bridge, including the cracked railing and the connecting parts of the road and the asphalt bridge are damaged which endanger the driver. From these problems it will be planned to design a bridge using a bridge structure with a box culvert, for the implementation of a box culvert using a cast in situ implementation method and the implementation method is applied in the form of 3D animation using a 3D modeling application. In the bridge design process for box culvert dimensions, referring to the standard reinforced concrete culverts of the Directorate General of Highways 2016 Based on the results and discussion, the stages of the box culvert implementation using the cast in situ method include site cleaning, mobilization, demolition of bridges and diversion of road currents, measurement and installation of bouw planks, closure of waterways, excavation of soil, installation of wooden chimneys, casting of K-125 work floors, work subfloor slab, box culvert wall work, top floor slab work, curb work, formwork demolition and concrete maintenance, wing wall work, embankment work, bridge oprit work, finishing. From the results of the calculation of the volume of box culvert iron on each work item, the total weight of iron is 2630.3 kg.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorRahman, Bobybobyrahman@polbeng.ac.idNIDN0007118707
UNSPECIFIEDEnda, Dedidedienda05@gmail.comNIDN1009078502
Uncontrolled Keywords: Box Culvert, Implementation Method, 3D Animation, Calculation of volume
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil B
Date Deposited: 07 Sep 2022 10:48
Last Modified: 07 Sep 2022 10:48
URI: http://eprints.polbeng.ac.id/id/eprint/7078

Actions (login required)

View Item View Item