Rencana Anggaran Biaya (RAB) Dan Time Schedule Pada Bangunan Gedung Puskesmas Dengan Menggunakan SNI 2021/2022 Dan AHSP No.1 PRT/M/2022

Rohmah, Mei Wasiatul (2022) Rencana Anggaran Biaya (RAB) Dan Time Schedule Pada Bangunan Gedung Puskesmas Dengan Menggunakan SNI 2021/2022 Dan AHSP No.1 PRT/M/2022. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
TA - 4103191268 - Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (937kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
TA - 4103191268 - Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (68MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
TA - 4103191268 - Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (68MB) | Preview
[img] Text (Full Text)
TA - 4103191268 - Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (72MB)

Abstract

The construction of the West Dumai Public Health Center has been arranged by the Ministry of Health to support health facilities in the West Dumai area. For this reason, planning documents are needed to support fundraising and development proposals to local governments, one of which is the budget plan (RAB). Planning the calculation of the Cost Budget Plan (RAB) which was made using the Work Unit Price Analysis (AHSP) calculation method in accordance with the PUPR Ministerial Regulation No.1/PRT/M/2022 in the field of work on the analysis of unit prices for wages and materials. Based on the calculation of the Budget Plan (RAB) the construction of the Dumai Barat Health Center building is Rp. (Six Billion Two Hundred Seventeen Million One Hundred Nineteen Thousand Rupiah), from the recapitulation of each work item such as Foundation Work of Rp.580,241,381.8, Structural Works of Rp. 1,614,542, 364.65, Floor Works of Rp. 420,862,119.11,Wall Works Rp. 1,7768,265,750,91, Ceiling Work of Rp. 246,598,770.82, Roof Work Rp. 377,106,099.87, and utility work Rp. 810,590,931.1,Finishing work Rp. 398,911,659.27, with a construction implementation time of 140 (Two Hundred and Ten) calendar days.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorArdita Pribadi, Julijuliardita@polbeng.ac.idNIDN0013088504
Uncontrolled Keywords: Budget Plan (RAB), PUPR Ministerial Regulation No.1/PRT/M/2022, Recapitulation, Implementation Time.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil A
Date Deposited: 09 Sep 2022 16:38
Last Modified: 13 Dec 2022 16:06
URI: http://eprints.polbeng.ac.id/id/eprint/7172

Actions (login required)

View Item View Item