Saputra, Andreas (2022) Animasi 3D Metode Pelaksanaan Pembangunan Rumah Susun Yayasan Laman Emas Riau Bangkit Sekolah Tinggi Agama Islam (Stai) H. Lukman Edy. Diploma thesis, Politeknik Negeri Bengkalis.
|
Text (Abstact)
TA-4103191255-Abstrak.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (538kB) | Preview |
|
|
Text (Bab I Pendahuluan)
TA-4103191255-Bab 1.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (727kB) | Preview |
|
|
Text (Daftar Pustaka)
TA-4103191255-Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (831kB) | Preview |
|
Text (Full Text)
TA-4103191255-Full text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (19MB) |
Abstract
The implementation method is an important thing in construction work, where the final result of a job is very influential on the implementation of the planned method. So that the delivery of this implementation method is easy to understand, the implementation method is delivered through visualization in the form of 3D animation. This research is a qualitative research that will describe the method of implementing the construction of the Yayan Laman Emas Flats Riau Bangkit Islamic High School (Stai) H. Lukam Edy. The first step begins with 3D images and continues with making 3D animated videos. The results of this study are the formation of 3D animation videos from the sequence of work in the method of implementing the construction of the Yayan Laman Emas Flats Riau Bangkit Islamic High School (Stai) H. Lukam Edy. The sequence of work is: 1. Mobilization, 2. Preliminary work, 3. Soil and sand work, 4. Upper structure work 5. Wall and plastering work, 6. Aluminum and mild steel work, 7. Architecture work, 8. Finishing work. , 9. Demobilization.
Item Type: | Thesis (Diploma) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||||||
Uncontrolled Keywords: | Building, Implementation Method, 3D Animation | ||||||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||||||
Depositing User: | D3 Teknik Sipil A | ||||||||||||
Date Deposited: | 14 Sep 2022 10:12 | ||||||||||||
Last Modified: | 14 Sep 2022 10:12 | ||||||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/7246 |
Actions (login required)
View Item |