Rancang Bangun Dan Analisa Pencucian Membran Pada Depot Air Isi Ulang

Hapis, Muhammad (2022) Rancang Bangun Dan Analisa Pencucian Membran Pada Depot Air Isi Ulang. Undergraduate thesis, POLITEKNIK NEGERI BENGKALIS.

[img]
Preview
Text (Abstract)
1.Skripsi-2204181164-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (146kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.Skripsi-2204181164-Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (157kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.Skripsi-2204181164-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (153kB) | Preview
[img] Text (Full Text)
4.Skripsi-2204181164-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB)

Abstract

This membrane washing machine uses a prime mover,namely the water pump. The working principle of this tool is that the water pump is the main driver or diverterfor water connected to a filter, which then the water will flow through a pipe, which then enters and exits through holes (pores)on the side of the membrane. After making observations the next stage is planning which includes designing drawings, calculations to determine the components to be used. The final stage is the manufacturing and assembly process. Whith this membrane washing device, it is designed to wash faster than the previous tool, where the previous washing tool took 1 day with a back and forth washing system. After testing the tool that has been designed, it only takes 4 hours to get good washing results. With 3 hours of washing using chemical mixtures and 1 hour using clean water with a water pressure of 4000 N/m2.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
UNSPECIFIEDAlhaffis, Firmanfirman.alhaffis@polbeng.ac.idNIDN0030018406
Uncontrolled Keywords: Design, washing machine, membrane, water pump, time 4 hours, water pressure 4000 N/m2.
Subjects: 410 ILMU TEKNIK > 430 ILMU KETEKNIKAN INDUSTRI > 435 Teknik Industri
Divisions: Jurusan Teknik Mesin > Sarjana Terapan Teknik Mesin Produksi dan Perawatan > TUGAS AKHIR
Depositing User: TMPP 2022
Date Deposited: 04 Jan 2023 15:26
Last Modified: 04 Jan 2023 15:26
URI: http://eprints.polbeng.ac.id/id/eprint/8214

Actions (login required)

View Item View Item