Penanggulangan Banjir Rob Menggunakan Metode Normalisasi Dan Tanggul Di Sungai (Studi Kasus : Sungai Jalan Pelajar Desa Kelemantan Kecamatan Bengkalis)

Farawati, Farawati (2020) Penanggulangan Banjir Rob Menggunakan Metode Normalisasi Dan Tanggul Di Sungai (Studi Kasus : Sungai Jalan Pelajar Desa Kelemantan Kecamatan Bengkalis). Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
TA-4103171151-(ABSTRAK).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (850kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
TA-4103171151-(BAB I PENDAHULUAN).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (926kB) | Preview
[img] Text (Daftar Pustaka)
TA-4103171151-(DAFTAR PUSTAKA).pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (240kB) | Request a copy
[img] Text (Full Text)
TA-4103171151-(FULL TEXT).pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (36MB) | Request a copy

Abstract

Shallow existing condition due to river sedimentation cause overflowing of the road river flow street Pelajar. This research was conducted to analyze the existing condition river Street Pelajar Kelemantan Village Bengkalis District. In an effort to overcome overflowing caused by tides. The method applied as an effort to tackle flooding in this river is to normalize rivers and embankments. To analyze river channel discharge based on data obtained from the field, including river profile measurement data, flow velocity measurement and tide level measurement The results of the calculation obtained the existing capacity in the river Street Pelajar Kelemantan Village Bengkalis District. high tide condition of 45.98 m³/det, whereas at low tide conditions of 7.260 m³/det. The dimensions of the plan based on calculations are able to accommodate a flow of 52.01 m³/det. For the calculation of the normalization excavation obtained by12445.04 m³, and the embankment is 3399.07 m³. The recapitulation of costs required for the execution of the work are Rp. 755,681,580

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorZulkarnain, ZulkarnainZulkarnaen@polbeng.ac.idNIDN0010078402
Uncontrolled Keywords: river, debit, normalization, embankment.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Unnamed user with email supianto@polbeng.ac.id
Date Deposited: 01 Feb 2023 09:42
Last Modified: 01 Feb 2023 09:42
URI: http://eprints.polbeng.ac.id/id/eprint/8380

Actions (login required)

View Item View Item