Perencanaan Struktur Atas Jembatan Desa Pematang Duku Timur - Desa Ketam Putih Dengan Struktur Komposit

Kurnia, Desi Ayu (2020) Perencanaan Struktur Atas Jembatan Desa Pematang Duku Timur - Desa Ketam Putih Dengan Struktur Komposit. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. Skripsi-4204161107-(ABSTRAK).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (268kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.Skripsi-4204161107-(Bab I PENDAHULUAN).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (146kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
4. Skripsi-4204161107-(DAFTAR PUSTAKA).pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (135kB) | Preview
[img] Text (Full Text)
3. Skripsi-4204161107-(FULL TEXT).pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (14MB) | Request a copy

Abstract

A bridge is a construction structure that allows connecting a transportation route separated by obstacles such as rivers, valleys, irrigation channels and even connecting islands that are quite far apart., the bridge connecting Pematang Duku Timur Village with Ketam Putih Village is in a damaged condition so that four-wheeled vehicles have to pass another alternative. The bridge is no longer feasible to cross because the upper structure has slacked, is very if it is forced to be passed by vehicles continuously and it will cause more severe damage. For this reason, a new bridge using a composite structure was planned. In this thesis, it is planned this bridge using a composite structure between steel girders and concrete slabs. This planning refers to SNI T-12-2004, SNI T-03-2005. SNI 1725:2016 andSNI 2833:2016. As for what is being planned is the girder, diaphragm, slab, sidewalk and bridge support posts. From the result of the planning, the steel girder profile is using WF 800 x 300 x 14 x 26, with a gap between 1,120 m. The steel angles profile diaphragm 400 x 400 x 13 x 21 mm using with a gap 4 m diaphragm, the elastomeric placement diameter is 350 x 300 x 36 mm.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorJauhari, Zev Alzevaljauhari@gmail.comNIDN0028019401
Uncontrolled Keywords: composite bridge, planning, upper structure
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: Unnamed user with email supianto@polbeng.ac.id
Date Deposited: 03 Feb 2023 10:42
Last Modified: 03 Feb 2023 10:42
URI: http://eprints.polbeng.ac.id/id/eprint/8388

Actions (login required)

View Item View Item