Animasi 3d Metode Pelaksanaan Pembangunan Gedung Pusat Pembinaan Karakter Politeknik Negeri Bengkalis

Nizam, Khairul (2022) Animasi 3d Metode Pelaksanaan Pembangunan Gedung Pusat Pembinaan Karakter Politeknik Negeri Bengkalis. Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-4103191279-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (514kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-4103191279-Bab 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (6MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4103191279-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (341kB) | Preview
[img] Text (Full Text)
4. TA-4103191279-Full Text.pdf - Submitted Version
Restricted to Registered users only

Download (12MB)

Abstract

Is planning a building, it is necessary to have an implementation method can be interpreted as a procedure taken to realize a facility or infrastructure in a certain way in order to achieve a goal. The use of appropriate, practical, fast and safe implementation methods is very helpful in completing contruction work so that the objectives of the project can be achieved properly. In an effort to have a good understanding of the implementation method, marking 3D animation vidios is considered very suitable to be done because it can see the development process from start to finish. This research method discusses the method that is considered the best to be applied in the implementation of the contruction of the Bengkalis State Polytechnic Character Development Center Building and also calculates the volume of concrete and iron work. The result of this study explain that to get good work result, it is necessary to develop an implementation method that will be applied in the field. By delivering the implementation method trough 3D animatin video animation, a person’s understanding is judged to be getting better about the implementation method.

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorRahman, Bobybobyrahman@polbeng.ac.idNIDN0007118707
Thesis advisorEnda, Dedidedienda05@gmail.comNIDN1009078502
Uncontrolled Keywords: Implementation Method Building, Contruction Work, 3D Animation
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 423-RancangKota
410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 427 Teknik Arsitektur
410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 427 Teknologi Alat Berat
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: D3 Teknik Sipil A
Date Deposited: 16 Feb 2023 15:40
Last Modified: 16 Feb 2023 15:40
URI: http://eprints.polbeng.ac.id/id/eprint/8415

Actions (login required)

View Item View Item