Analisis Kelayakan Rencana Pembangunan Jalan Poros Air Putih - Selat Baru dari segi Investasi dan Lalu Lintas

Susanti, Asni (2023) Analisis Kelayakan Rencana Pembangunan Jalan Poros Air Putih - Selat Baru dari segi Investasi dan Lalu Lintas. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-4204191218-ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (13kB) | Preview
[img]
Preview
Text (Bab 1 Pendahuluan)
2. TA-4204191218-BAB 1 PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (95kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-4204191218-DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (89kB) | Preview
[img] Text (Full Text)
4. TA-4204191218-FULL TEXT.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (26MB)

Abstract

Along with population growth and according to the spatial layout of the Bengkalis Regency, a road plan is needed to facilitate movement from Bengkalis District to Bantan District. Based on this condition, the Public Works and Spatial Planning Office of Bengkalis Regency plans to build the Air Putih - Selat Baru Shaft Road. However, before carrying out the road construction work, it is necessary to evaluate the feasibility of the planned road construction using one of the study stages, namely a feasibility study. The method used in this study is the with and without method from an investment and traffic perspective. In the feasibility analysis from a Traffic perspective used the Degree of Saturation (DS) indicator and from an Investment perspective, Net Present Value (NPV) and Benefit Cost Ratio (BCR) is used. After the feasibility analysis was carried out, the NPV results were worth Rp. 795,055,896,163 or has a positive value and BCR has a value of more than 1, that is 25, so it is said to be worth investing in economically. However, it is not yet feasible in traffic perspective because the degree of saturation of the existing road is still below the standard value (0.85), that is 0.15

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorAnanda, Faisalanandabrawijaya@gmail.comNIDN1019028502
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ
Date Deposited: 22 Aug 2023 10:14
Last Modified: 22 Aug 2023 10:14
URI: http://eprints.polbeng.ac.id/id/eprint/9385

Actions (login required)

View Item View Item