Analisa Dan Rancang Bangun Sistem Proteksi Motor Listrik 3 Phasa Menggunakan Phase Failure Relay

Saputra, Aditya Ramadhan (2023) Analisa Dan Rancang Bangun Sistem Proteksi Motor Listrik 3 Phasa Menggunakan Phase Failure Relay. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1. TA-3204191252-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (182kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2. TA-3204191252-BAB I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (290kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3. TA-3204191252-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (286kB) | Preview
[img] Text (Full Text)
4. TA-3204191252-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB)

Abstract

In a basic electricity network, the quality of electric power distribution is very much needed. There are also obstacles in the distribution of electric power that can affect or damage the electric power system, namely missing one of the phases, reversed phase, overvoltage and undervoltage. If this voltage barrier is connected to electrical or electronic equipment and exceeds its nominal voltage tolerance limit, then it can interfere with the performance of the equipment or can damage it. From testing the Phase Failure Relay tool, it can be concluded that the Phase Failure Relay tool is designed and made to protect the circuit properly, in the sense that this tool can detect the presence of a missing phase, reversed phase, overvoltage of +5% and undervoltage of -10% of nominal voltage and activates an alarm lamp when a fault is detected. The fault time can be set within 1.5 seconds to 4 seconds for overvoltage and 2 seconds to 9 seconds for undervoltage. alarm when a disturbance is detected.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorAbidin, Zainalzaiinalabidin@gmail.ac.idNIDN1018086901
Uncontrolled Keywords: Memproteksi, Phase Failure Relay, Hilang Salah Satu Phasa, Phasa Terbalik, Overvoltage, Undervoltage
Subjects: 410 ILMU TEKNIK > 450 TEKNIK ELEKTRO DAN INFORMATIKA > 451 Teknik Elektro
Divisions: Jurusan Teknik Elektro > Sarjana Terapan Teknik Listrik > TUGAS AKHIR
Depositing User: TEKNIK lISTRIK
Date Deposited: 24 Aug 2023 10:25
Last Modified: 24 Aug 2023 10:25
URI: http://eprints.polbeng.ac.id/id/eprint/9456

Actions (login required)

View Item View Item