Putri, Fifi Mulya (2023) Analisis Biaya Perawatan Dan Pemeliharaan Jalan Perkerasan Lentur Di Kabupaten Bengkalis (Studi Kasus : Jl. Pambang – Teluk Lancar Sta 00+000 Sampai Sta 00+363). Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
1. TA-4204191239-ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (9kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2. TA-4204191239-BAB I PENDAHULUAN.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (135kB) | Preview |
|
|
Text (Daftar Pustaka)
3. TA-4204191239-DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (229kB) | Preview |
|
Text (Full Text)
4. TA-4204191239-FULL TEXT.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (10MB) |
Abstract
Along with the increasing population in Bengkalis Regency, especially on Jalan Pambang Teluk Lancar. Therefore, safe, comfortable, and efficient road conditions are needed to support the economic needs of the community. Jl. Pambang - Teluk Lancar is a road that connects settlements with city centers, with these conditions, good pavement conditions are needed so as not to disturb the comfort of road users. The method used in calculating maintenance over the life of the plan, which is 10 (ten) years in the future, is Life Cycle Cost. Life Cycle Cost is a method used to obtain alternatives to various possibilities in decision making and describe the present and future value of a road construction development, namely by calculating and considering inflation and interest rates. The initial construction cost or initial cost incurred is Rp2,440,000,000.00. Routine maintenance costs amounted to Rp13,816,000 and periodic maintenance costs amounted to Rp380,817,000 which have been validated by road maintenance and road maintenance experts. The maintenance cost of the LCC is Rp1,180,613,953.72. The total life cycle cost of LCC is Rp3,620,613,953.72. At the lowest bank interest rate NPV calculation (3.5%), the NPV is Rp2,886,093,243.78. At the average bank interest rate (4.5%), the NPV is Rp2,935,225,326.60. Meanwhile, at the highest bank interest rate (5.6%), the NPV reached Rp3,040,275,561.42.
Item Type: | Thesis (Undergraduate) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||||||
Uncontrolled Keywords: | Analysis, Cost, Life Cycle Cost, Road Maintenance | ||||||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||||||
Depositing User: | D4 TPJJ | ||||||||||||
Date Deposited: | 25 Aug 2023 21:13 | ||||||||||||
Last Modified: | 30 Aug 2023 11:14 | ||||||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/9506 |