Analisis Life Cost (LCC) Pada Pembangunan Gedung Pelayanan Kesehatan Masyarakat (Studi kasus :Puskesmas Sungai Alam Kab.Bengkalis )

Atika, Nurin (2023) Analisis Life Cost (LCC) Pada Pembangunan Gedung Pelayanan Kesehatan Masyarakat (Studi kasus :Puskesmas Sungai Alam Kab.Bengkalis ). Diploma thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1.TA-4103201350-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (67kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.TA-4103201350-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (80kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.TA-4103201350-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (193kB) | Preview
[img] Text (Full Text)
4.TA-4103201350-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (35MB)

Abstract

In a good building construction, planning the life cycle costs of the building is very necessary because these costs will affect the estimate of the amount of costs required for the future of the building itself, which consists of initial costs, operational costs and maintenance and replacement costs. Puskesmas is one of the infrastructure facilities that operates every day. So this study aims to calculate the Life Cycle Cost at Sungai Alam Bengkalis Health Center. Based on the results of the study, it was found that the four components used in the preparation of Life Cycle Costs that occur starting from planning the Puskesmas building to the economic life of the building for 50 years at the ighest inflation conditions are, Operational costs at the highest conditions are IDR 13,773,096,630. 14, maintenance and replacement costs at the highest conditions are Rp. 29,914,855,118.16, as well as the initial cost of Rp.8,188,727,078.20. And finally the cost of dismantling the Puskesmas building is Rp. 1,369,212,344.25 Net Present Value (NPV) In conditions of high inflation with high bank interest rates of Rp. 11,713,925,356.08

Item Type: Thesis (Diploma)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGunawan, Gunawangunawan@polbeng.ac.idNIDN1024027702
Uncontrolled Keywords: Life Cycle Cost (LCC), NPV
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 429 Bidang Teknik Sipil Lain Yang Belum Tercantum
Divisions: Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR
Depositing User: Teknik Sipil D3
Date Deposited: 27 Aug 2023 14:08
Last Modified: 27 Aug 2023 14:08
URI: http://eprints.polbeng.ac.id/id/eprint/9981

Actions (login required)

View Item View Item