Items where Division is "Jurusan Teknik Perkapalan > Diploma Tiga Teknik Perkapalan > LAPORAN KERJA PRAKTEK" and Year is 2021

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | D | H | I | M | N | R | S | T | W | Y
Number of items: 14.

A

Anggi, Anggisania Siregar (2021) Manajemen PT.Karimun Sembawang Shipyard. [Experiment] (Unpublished)

D

Damara, Dony (2021) Proses Sandblasting Kapal Spob Ost Satu PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)

H

Hasan, Arifin Septiadi (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)

I

Iswandi, Muhammad (2021) PT. Bengkalis Dockindo Perkasa. [Experiment] (Unpublished)

M

Masduki, Ilham (2021) Drawing Dan Produksi Pembuatan Oil Tank Kapasitas 1,5 Ton. 3 PT. Sembawang Marine Shipyard. [Experiment] (Unpublished)

N

Nasution, Aulia Hamonangan (2021) Sistem Zinc Anode Pada Kapal Tb. Anugerah PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)

Natarida, Windah (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)

Nofita, Susan Dwi (2021) PT. Yasa Wahana Tirta Samudra. [Experiment] (Unpublished)

R

Rahmawati, Widya Suci (2021) Proses Drawing Replating Area PT. Karimun Marine Shipyard. [Experiment] (Unpublished)

S

Sobirin, M. (2021) Perhitungan Material Dan Berat PondasiI Gentri Crane Kapasitas 25 Ton Di PT.Karimun Sembawang Shipyard. [Experiment] (Unpublished)

Syaifullah, M. (2021) PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)

T

Tarmizi, M. (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)

W

Winanda, Surya (2021) PT. Karimun Marine Shipyard. [Experiment] (Unpublished)

Y

Yazid, Abu (2021) PT. Karimun Sembawang Shipyard. [Experiment] (Unpublished)

This list was generated on Fri Dec 27 05:28:30 2024 WIB.