Up a level |
Anggi, Anggisania Siregar (2021) Manajemen PT.Karimun Sembawang Shipyard. [Experiment] (Unpublished)
Damara, Dony (2021) Proses Sandblasting Kapal Spob Ost Satu PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)
Hasan, Arifin Septiadi (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)
Iswandi, Muhammad (2021) PT. Bengkalis Dockindo Perkasa. [Experiment] (Unpublished)
Masduki, Ilham (2021) Drawing Dan Produksi Pembuatan Oil Tank Kapasitas 1,5 Ton. 3 PT. Sembawang Marine Shipyard. [Experiment] (Unpublished)
Nasution, Aulia Hamonangan (2021) Sistem Zinc Anode Pada Kapal Tb. Anugerah PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)
Natarida, Windah (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)
Nofita, Susan Dwi (2021) PT. Yasa Wahana Tirta Samudra. [Experiment] (Unpublished)
Rahmawati, Widya Suci (2021) Proses Drawing Replating Area PT. Karimun Marine Shipyard. [Experiment] (Unpublished)
Sobirin, M. (2021) Perhitungan Material Dan Berat PondasiI Gentri Crane Kapasitas 25 Ton Di PT.Karimun Sembawang Shipyard. [Experiment] (Unpublished)
Syaifullah, M. (2021) PT. Harapan Teknik Shipyard. [Experiment] (Unpublished)
Tarmizi, M. (2021) PT. Yasa Wahana Tirta Samudera. [Experiment] (Unpublished)
Winanda, Surya (2021) PT. Karimun Marine Shipyard. [Experiment] (Unpublished)
Yazid, Abu (2021) PT. Karimun Sembawang Shipyard. [Experiment] (Unpublished)