Analysis Of Concrete And Reinforcement Quantity Take-Off of Bridge Approach Structures Using Autodeks Revit 2024 and Conventional Methods

Afrida, Rubiasih and Enda, Dedi (2026) Analysis Of Concrete And Reinforcement Quantity Take-Off of Bridge Approach Structures Using Autodeks Revit 2024 and Conventional Methods. Multidisciplinary Output Research For Actual and International Issue (MORFAI Journal), 6 (4). pp. 6317-6325. ISSN 2808-6635 (Unpublished)

[thumbnail of Jurnal Terakreditasi Sinta 3] Text (Jurnal Terakreditasi Sinta 3)
6317+MORFAI_Manuscript_Rubiasih+Afrida.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (1MB) | Request a copy

Abstract

Multidisciplinary Output Research For Actual and InternationalIssue (MORFAI Journal) ISSN (e): 2808-6635Volumes 6 No. 4 (2026)Publish byRadja Publika6317ANALYSIS OF CONCRETE AND REINFORCEMENT QUANTITY TAKE-OFF OF BRIDGE APPROACH STRUCTURES USING AUTODESK REVIT 2024 AND CONVENTIONAL METHODSRubiasih Afrida1*, Dedi Enda2Politeknik Negeri Bengkalis/ Civil Engineering Study Program, BengkalisE-mail: [email protected]*,E-mail: [email protected]: 10 May 2026Accepted: 05June 2026Revised : 19May 2026Published: 15June 2026AbstractThe development of Building Information Modeling (BIM) has accelerated the digitalization of construction planning and management processes, including Quantity Take Off (QTO) calculations that require high speed and accuracy. However, the estimation of concrete and reinforcement quantities for bridge approach structures is still commonly performed using conventional methods, which are prone to calculation errors and require relatively more time. In addition, studies investigating the application of BIM to bridge approach structures with curved geometries remain limited. This study aims to analyze and compare the Quantity Take Off results of concrete and reinforcement obtained using Autodesk Revit 2024 and conventional methods for the bridge approach structures of Sei Kuala and Sei Akar Bridges on the Bagan Jaya–Tembilahan road section. A comparative quantitative research method was employed by developing a three-dimensional modelbased on project design data and extracting quantity information using the Schedule/Quantity feature in Autodesk Revit 2024. The accuracy of the calculated quantities was evaluated using the Average Error and Root Mean Square Error (RMSE) parameters. The results indicate that Autodesk Revit 2024 is capable of producing quantity estimates that closely correspond to those obtained through conventional methods, with an Average Error of 2.619% for concrete and 5.920% for reinforcement, and RMSE values of 0.473m³ and 0.656 m³, respectively. The largest deviation was observed in the deck slab reinforcement due to the curved geometry of the bridge approach, which caused Autodesk Revit to calculate the length of each reinforcing bar individually. Overall, the findings demonstrate that Autodesk Revit 2024 can serve as an effective and reliable alternative for performing Quantity Take Off on bridge approach structures with complex geometries.

Item Type: Article
Uncontrolled Keywords: Building Information Modeling (BIM), Autodesk Revit, Quantity Take Off (QTO), Bridge Approach Structure, Reinforcement.
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 624 – Teknik Sipil dan Konstruksi > 624.3 – Konstruksi Jembatan dan Terowongan
Divisions: Jurusan Teknik Sipil > Sarjana Terapan (D-IV) Teknik Perancangan Jalan dan Jembatan > Artikel Ilmiah
Depositing User: TPJJ KELAS A 2022
Date Deposited: 30 Jul 2026 01:18
Last Modified: 30 Jul 2026 01:18
URI: https://eprints.polbeng.ac.id/id/eprint/5431

Actions (login required)

View Item
View Item