Hafsah, Hafsah (2026) Ketersediaan Perlengkapan Bongkar Muat terhadap Kelancaran Bongkar Kontainer pada KM. Teluk Flaminggo oleh PT. Salam Pacific Indonesia Lines Cabang Pekanbaru. Diploma thesis, Politeknik Negeri Bengkalis.
TA-8303230034-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (240kB)
TA-8303230034-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (353kB)
TA-8303230034-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (198kB)
TA-8303230034-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (4MB) | Request a copy
Abstract
This final project research proposal discusses the availability of loading and unloading equipment for the smooth unloading of containers on the KM. Teluk Flaminggo ship by PT. Salam Pacific Indonesia Lines Pekanbaru Branch. Loading and unloading activities are one of the important factors in supporting the smooth operation of ships and the accuracy of shipping schedules. The availability of adequate loading and unloading equipment greatly determines the effectiveness and efficiency of the container unloading process. This study aims to determine the condition of the availability of loading and unloading equipment, identify obstacles faced in the implementation of container unloading, and analyze the availability of loading and unloading equipment for the smooth unloading of containers on the KM. Teluk Flaminggo ship by PT. Salam Pacific Indonesia Lines Pekanbaru Branch. This study uses qualitative methods. The methods used to obtain the required information from related parties are preparing direct observation methods (observation), interviews and documentation. The results of the study indicate that the availability of loading and unloading equipment has a very important role in supporting the smooth unloading of containers on the KM. Teluk Flaminggo ship. However, there are still several obstacles faced, such as damage to loading and unloading equipment, limited number of cranes when there is an increase in loading and unloading activities, unfavorable weather conditions, and the potential for operational delays that can cause increased ship berthing time (long time) and delayed ship departures (delay departure).
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Loading and unloading equipment, Smooth unloading, Containers |
| Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 623.8 – Kapal dan Teknik Perkapalan > 623.88 Teknologi Pelabuhan, Kapal Selam, dan Dermaga |
| Divisions: | Jurusan Kemaritiman > Diploma Tiga (D-III) Ketatalaksanaan Pelayaran Niaga > TUGAS AKHIR |
| Depositing User: | D-III Ketatalaksanaan Pelayaran Niaga Kelas B |
| Date Deposited: | 20 Aug 2026 03:04 |
| Last Modified: | 20 Aug 2026 03:04 |
| URI: | https://eprints.polbeng.ac.id/id/eprint/6303 |
