Mahendra, Yusril (2026) Analisis Preventive Maintenance pada Motor Induksi Tiga Fasa Vacuum Pump di PT. Pindo Deli Perawang Menggunakan Metode MTBF Dan MTTR. Other thesis, Politeknik Negeri Bengkalis.
1. TA-3204221471-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (150kB)
2. TA-3204221471-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (193kB)
3. TA-3204221471-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (175kB)
4. TA-3204221471-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (2MB) | Request a copy
Abstract
Three-phase induction motors in vacuum pump systems are critical equipment that support the production process at PT Pindo Deli Pulp and Paper Perawang. Motor failures can increase downtime, reduce reliability, and disrupt productivity. This study aims to analyze motor reliability using the MTBF and MTTR methods, identify the causes of failures, and evaluate preventive maintenance. The analysis was conducted on failure data from January to June 2026 by calculating MTBF, MTTR, availability, and downtime. The results showed that there were 9 failure incidents with a total downtime of 32.02 hours, a cumulative MTBF of 3,226.86 hours, a cumulative MTTR of 31.85 hours, and an availability of 72.62%. The Vacuum Filter and Vacuum Belt components had the highest MTBF (1,170.92 hours), while the Motor component had the highest MTTR (13.32 hours). Therefore, the preventive maintenance program needs to be optimized by determining maintenance intervals based on MTBF and MTTR, prioritizing critical components, and increasing routine inspections to reduce downtime and improve equipment reliability.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Preventive Maintenance, Three-Phase Induction Motor, Vacuum Pump, MTBF, MTTR, Availability, Downtime. |
| Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 670 – Manufaktur 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.9 – Perawatan dan Perbaikan Peralatan Listrik 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.7 – Sistem Otomatisasi dan Kontrol Industri 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.6 – Instrumentasi dan Pengukuran Listrik |
| Divisions: | Jurusan Teknik Elektro > Sarjana Terapan (D-IV) Teknik Listrik > SKRIPSI |
| Depositing User: | TEKNIK LISTRIK 2022 Kelas A |
| Date Deposited: | 21 Aug 2026 04:28 |
| Last Modified: | 21 Aug 2026 04:28 |
| URI: | https://eprints.polbeng.ac.id/id/eprint/6431 |
