Analisa Inspeksi Pemeliharaan Siang Gardu Distribusi Jurusan Vip di PT. Santosa Asih Jaya

Rasyid, M.Alvian Noor (2026) Analisa Inspeksi Pemeliharaan Siang Gardu Distribusi Jurusan Vip di PT. Santosa Asih Jaya. Other thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstrak] Text (Abstrak)
Skripsi-32045221512-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (187kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
Skripsi-3204221512-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (177kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Skripsi-3204221512-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (170kB)
[thumbnail of Full Text] Text (Full Text)
Skripsi-3204221512-Full Text 111.pdf - Accepted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (2MB) | Request a copy

Abstract

Distribution substations are one of the essential components of the electric power distribution system, serving to maintain the continuity and reliability of electricity supply to consumers. The condition of distribution substations must be monitored regularly through maintenance inspections to detect potential failures at an early stage and ensure that all equipment operates in accordance with established standards. This final project aims to analyze the implementation of daytime maintenance inspections on distribution substations along the VIP feeder at PT Sentosa Asih Jaya. The study employed a descriptive method using field observations, documentation, and literature review. The data were obtained from inspection results covering the physical condition of the distribution substations, distribution transformers, grounding systems, conductor connections, protective devices, and other supporting components. The analysis indicates that daytime maintenance inspections are effective in identifying several conditions that may affect the reliability of distribution substations, including equipment requiring cleaning, tightening of electrical connections, and repair of specific components. Routine implementation of maintenance inspections contributes to improving the reliability of the distribution system, minimizing the risk of electrical disturbances, and supporting the provision of a safe, reliable, and sustainable electricity service. Therefore, daytime maintenance inspections should be carried out consistently in accordance with standard operating procedures to maintain the performance of distribution substations and extend the service life of electrical equipment.

Item Type: Thesis (Other)
Uncontrolled Keywords: Keywords: daytime maintenance inspection, distribution substation, VIP feeder, distribution system reliability, PT Sentosa Asih Jaya.
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.1 – Dasar-Dasar Listrik dan Elektronika
600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.2 – Sistem Tenaga Listrik dan Distribusi
600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.9 – Perawatan dan Perbaikan Peralatan Listrik
600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.6 – Instrumentasi dan Pengukuran Listrik
600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.3 – Elektronika Daya dan Kontrol
Divisions: Jurusan Teknik Elektro > Sarjana Terapan (D-IV) Teknik Listrik > SKRIPSI
Depositing User: TEKNIK LISTRIK 2022 Kelas B
Date Deposited: 22 Aug 2026 04:54
Last Modified: 22 Aug 2026 04:54
URI: https://eprints.polbeng.ac.id/id/eprint/6508

Actions (login required)

View Item
View Item