Ramdani, Saim (2026) Pemasangan Grounding Cluster Pada Pemeliharaan Jaringan Tegangan Menengah. Other thesis, Politeknik Negeri Bengkalis.
TA-3204221498-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (164kB)
TA-3204221498-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (172kB)
TA-3204221498-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (149kB)
TA-3204221498-Full Text556.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (1MB) | Request a copy
Abstract
The maintenance of 20 kV Medium Voltage Distribution Networks (MVDN) requires the implementation of strict work safety procedures to prevent the risks of induced voltage, residual voltage, and back-feeding voltage that may still occur even after the network has been de-energized. The observation results showed that all installation stages were carried out in accordance with the Standard Operating Procedures (SOP), including verifying that the network was de-energized using a voltage detector, installing the grounding rod, connecting the grounding cable, attaching the phase clamps to the conductors, inspecting all connections, and measuring the grounding resistance before maintenance work began. The measurement results indicated that the grounding resistance at Jalan Utama Penebal decreased from 12.84 Ω to 4.32 Ω after the installation of the Grounding Cluster. The implementation of the Grounding Cluster provides a low-impedance path for fault current dissipation, thereby minimizing the risk of electric shock to maintenance personnel and creating a safer working environment. Therefore, the installation of the Grounding Cluster has proven to be an effective solution for enhancing work safety while improving the reliability of medium-voltage distribution network maintenance.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Keywords: Grounding Cluster, Medium Voltage Distribution Network, Grounding Resistance, Work Safety, Network Maintenance. |
| Subjects: | 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.2 – Sistem Tenaga Listrik dan Distribusi 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.9 – Perawatan dan Perbaikan Peralatan Listrik 600 – ILMU TEKNIK DAN ILMU TERAPAN > 625 – Teknik Kelistrikan dan Elektronik > 625.6 – Instrumentasi dan Pengukuran Listrik |
| Divisions: | Jurusan Teknik Elektro > Sarjana Terapan (D-IV) Teknik Listrik > SKRIPSI |
| Depositing User: | TEKNIK LISTRIK 2022 Kelas B |
| Date Deposited: | 22 Aug 2026 07:28 |
| Last Modified: | 22 Aug 2026 07:28 |
| URI: | https://eprints.polbeng.ac.id/id/eprint/6547 |