Analisis Bahaya Pekerjaan Dan Penyusunan Rencana Pengendaliaan Resiko Menggunakan Metode Job Hazard Analysis (Jha):Pembangunan Gudang Cangkang Sawit

Zuljanuardi, Andre (2026) Analisis Bahaya Pekerjaan Dan Penyusunan Rencana Pengendaliaan Resiko Menggunakan Metode Job Hazard Analysis (Jha):Pembangunan Gudang Cangkang Sawit. Diploma thesis, Politeknik Negeri Bengkalis.

[thumbnail of Abstract] Text (Abstract)
1. TA-4103221452-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (46kB)
[thumbnail of Bab I Pendahuluan] Text (Bab I Pendahuluan)
2. TA-4103221452-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (39kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
3. TA-4103221452-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (89kB)
[thumbnail of Full Text] Text (Full Text)
4. TA-4103221452-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (9MB) | Request a copy

Abstract

Construction work involves various potential hazards that may cause occupational accidents if they are not properly identified and controlled. These hazards can be found in reinforcement work, which involves sharp materials, physical activities, and unsafe working conditions that may cause injuries. This study aims to identify potential hazards, analyze risk levels, and determine proposed risk controls in the construction of a Palm Kernel Shell Warehouse using the Job Hazard Analysis (JHA) method. The study was conducted on reinforcement work for pile caps, tie beams, pedestal columns, walls, and floor slabs. Data were collected through direct observation, interviews, and documentation. JHA analysis was conducted by breaking down each activity into several work steps, identifying potential hazards, and assessing risks based on Consequences (C), Exposure (E), and Probability (P) using the formula R = C × E × P. The results identified two risk levels, namely Priority 3 with a risk value of 45 and Substantial with risk values of 90 and 135. Proposed controls include improving work methods, organizing work areas, increasing supervision, using appropriate equipment, and implementing personal protective equipment (PPE).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Job Hazard Analysis, occupational health and safety, reinforcement work, work risk.
Subjects: 600 – ILMU TEKNIK DAN ILMU TERAPAN > 690 – Konstruksi Bangunan
Divisions: Jurusan Teknik Sipil > Diploma Tiga (D-III) Teknik Sipil > TUGAS AKHIR
Depositing User: D-III TEKNIK SIPIL 2023 Kelas A
Date Deposited: 31 Aug 2026 02:06
Last Modified: 31 Aug 2026 02:06
URI: https://eprints.polbeng.ac.id/id/eprint/7141