Dampak Jalan Lingkar Terhadap Pertumbuhan Ekonomi (Studi Kasus Jalan Lingkar Pusat Kota-Desa Sukamaju Kecamatan Bantan)

Khan, Syaiful (2023) Dampak Jalan Lingkar Terhadap Pertumbuhan Ekonomi (Studi Kasus Jalan Lingkar Pusat Kota-Desa Sukamaju Kecamatan Bantan). Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1.Skripsi-4204191226-Abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (713kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.Skripsi-4204191226-BAB 1 Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (12kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.Skripsi-4204191226-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (118kB) | Preview
[img] Text (Full Text)
4.Skripsi-4204191226-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (4MB) | Request a copy

Abstract

This study analyzes the impact of the ring road on economic growth in the context of Kelurahan/Village. Ring roads are road infrastructure that surrounds an area with the aim of reducing congestion in the city center and increasing accessibility. After carrying out the interview and data collection stages, it turned out that the construction of the ring road also affected the villages and communities affected by the ring road. From the research results obtained from the questionnaire, namely that there was an increase after the ring road was built with a GDP yield of 74%, a decrease in the unemployment rate of 64%, an increase in the inflation rate of 55% and an increase in the investment level of 62%. From the results of the 2013 AHSP on the construction of the ring road that had been made, the final result was Rp. 3,520,290,660.00 (Three billion five hundred and twenty million two hundred and ninety thousand six hundred sixty rupiah). Whereas in 2023 it will be Rp. 6,102,115,551.00 (Six Billion One Hundred Two Million One Hundred Fifteen Thousand Five Hundred Fifty One Rupiah).

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorAnanda, Faisalfaisalananda@polbeng.ac.idNIDN1019028502
Uncontrolled Keywords: Ring road, GDP, unemployment rate, inflation rate, investment level.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ
Date Deposited: 07 Sep 2023 16:50
Last Modified: 07 Sep 2023 16:50
URI: http://eprints.polbeng.ac.id/id/eprint/10484

Actions (login required)

View Item View Item