Saputra, Wiwin (2020) Perencanaan Drainase Jalan Utama Desa Harapan Kecamatan Sungai Apit. Diploma thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
10.TA - 4103161080 - ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (72kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2.TA - 4103161080 - BAB I.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (130kB) | Preview |
|
|
Text (Daftar Pustaka)
7.TA - 4103161080 - DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (52kB) | Preview |
|
Text (Full Text)
9.TA - 4103161080 - Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (5MB) |
Abstract
Visually, the drainage that is being reviewed is still in natural conditions, this is one of the reasons this area often experiences flooding during high rainfall and due to tides. Therefore, the writer wants to plan a concrete drainage channel so that the area around the drainage which is on the main road of the village hopes that it will not experience flooding caused by tides and high rainfall. Therefore, research is needed on this matter by measuring directly the field and analyzing the results obtained. The method used in analyzing the intensity of rainfall is to use the Gumbel distribution and the Mononobe method with rainfall data obtained from the Siak Regency Agriculture Office 2019. Meanwhile, to analyze the rainfall discharge and river channel discharge using the Rational method based on data obtained from the field, including data measurement of drainage profile, measurement of flow velocity and measurement of existing water level. The results of the calculation obtained the existing capacity at the Jln. Utama Desa Harapan when the tide condition is 22,34626 m³ / second, while at low tide it is 3.044025 m³ / second on the left side of the road while on the right side of the road the existing capacity on the channel is 20,1743 m³ / second and normal conditions or low tide of 2.6638 m³ / second. Calculation of the rainfall and discharge plans for the upstream part of the water is 0.9253 m³ / second. From the data obtained in the field as well as from other sources, it can be obtained a concrete drainage section plan with a channel base width of 2.5 m with a channel height of 2 m and a guard height of 0.8 m. And can also the results of the calculation of the RAB for the entire work item of Rp. 2,055,183,000.
Item Type: | Thesis (Diploma) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | main road drainage planning in Harapan, discharg, channel dimensions | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Diploma Tiga Teknik Sipil > TUGAS AKHIR | ||||||||
Depositing User: | Editor Perpustakaan | ||||||||
Date Deposited: | 10 Mar 2021 12:13 | ||||||||
Last Modified: | 10 Mar 2021 12:43 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/116 |
Actions (login required)
View Item |