Analisis Penjadwalan Waktu Fabrikasi Paneline Blok LQ08 Projek Sturgeon WTIV PT.KARIMUN SEMBAWANG SHIPYARD

Fatmawati, Fatmawati (2023) Analisis Penjadwalan Waktu Fabrikasi Paneline Blok LQ08 Projek Sturgeon WTIV PT.KARIMUN SEMBAWANG SHIPYARD. [Experiment] (Unpublished)

[img]
Preview
Text (Cover - Dartar Isi)
KP-1103211267-COVER-DAFTAR ISI.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (368kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
KP-1103211267-DAFTAR PUSTAKA.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (11kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
KP-1103211267-BAB I-PENDAHULUAN.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (24kB) | Preview
[img]
Preview
Text (Full Text)
KP-1103211267-FULL TEXT-1.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (9MB) | Preview
Item Type: Experiment
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorIkhsan, Muhammadiksanmovic@gamail.com19880212202031002
Subjects: 410 ILMU TEKNIK > 480 ILMU PERKAPALAN > 481 Teknik Perkapalan
Divisions: Jurusan Teknik Perkapalan > Diploma Tiga Teknik Perkapalan > LAPORAN KERJA PRAKTEK
Depositing User: D3 Teknik Perkapalan
Date Deposited: 01 Feb 2024 17:31
Last Modified: 20 May 2024 16:10
URI: http://eprints.polbeng.ac.id/id/eprint/11962

Actions (login required)

View Item View Item