Studi Kelayakan Nilai Investasi Proyek Perencanaan Jembatan Pulau Bengkalis – Pulau Sumatra

Kurniawan, Fitrah (2024) Studi Kelayakan Nilai Investasi Proyek Perencanaan Jembatan Pulau Bengkalis – Pulau Sumatra. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstract)
1. TA-4204201354-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (10kB)
[img] Text (Bab I Pendahuluan)
2. TA-4204201354-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (140kB)
[img] Text (Daftar Pustaka)
3. TA-420420154-Daftar Pustaka.pdf
Available under License Creative Commons Attribution Share Alike.

Download (236kB)
[img] Text (Full Text)
4. TA-4204201354-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (5MB) | Request a copy

Abstract

This study evaluates the investment feasibility of the Bengkalis Island - Sumatra Island Bridge project using the Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP) methods. The analysis includes site selection using the Analytical Hierarchy Process (AHP) method, cost estimation, and revenue projection from toll tariffs. The results show that NPV>0, amounting to Rp.260.395.041.806. IRR> Discount rate, and Payback Period is projected to occur in 2080, faster than the economic life of the project, so based on the Feasibility Study of investment Value, it can be concluded that the construction of the Bengkalis Island - Sumatra Island Bridge is feasible.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorGunawan, Gunawangunawan@polbeng.ac.idNIDN1024027702
Thesis advisorSaputra, Hendrahendrasaputra@polbeng.ac.idNIDN0029108404
Uncontrolled Keywords: Keyword: Investment Feasibility, NPV, IRR, Payback Period, Analytical Hierarchy Process.
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ A 2024
Date Deposited: 24 Aug 2024 07:33
Last Modified: 24 Aug 2024 07:33
URI: http://eprints.polbeng.ac.id/id/eprint/13684

Actions (login required)

View Item View Item