Evaluasi Dan Perencanaan U-Turn (Studi Kasus : Jalan Jendral Sudirman, Kota Dumai)

Putri, Merli Jupika (2024) Evaluasi Dan Perencanaan U-Turn (Studi Kasus : Jalan Jendral Sudirman, Kota Dumai). Undergraduate thesis, Politeknik Negeri Bengkalis.

[img] Text (Abstract)
1. TA-4204201335-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (63kB)
[img] Text (BAB I Pendahuluan)
2. TA-42041335-BAB I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (126kB)
[img] Text (Daftar Pustaka)
3. TA-4204201335-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (58kB)
[img] Text (Full Text)
4. TA-4204201335-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Request a copy

Abstract

General Sudirman road is one of the main roads in Dumai City which has an important role in supporting vehicle mobility. The U-turn facility on Jalan Jenderal Sudirman is a means used by vehicles to cross over to other road networks. However, one of the problems that often occurs is that vehicles making U-turns at intersections do not follow driving rules, which can cause traffic conflicts. This study aims to evaluate the performance of road sections and the performance of the U-turn in front of the PLN office as well as the illegal U-Turn at DIC 3 intersection, by planning a new U-turn in front of Awal Bross Hospital so that vehicles do not make U-turns at the intersection. The methodology used in this research is PKJI 2023 and Bina Marga 06/BM/2005. From the results of the evaluation of the U-Turn in front of the PLN office, the queue length obtained on Monday with a peak hour of 23m with a delay time of 11.5 seconds. this shows that there are no significant obstacles and the traffic flow is smooth. And the results of the U-Turn planning obtained a turning radius of 12.8, a median opening width of 25.6 meters, and the selection of the type of U-turn median opening is carried out using a type of U-turn in the middle of the road section with a U-turn movement from the inside lane to the second lane of the opposing lane.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorIdham, Muhammadidham@polbeng.ac.idNIDN0007098401
Uncontrolled Keywords: PKJI 2023, BM 06/BM/2005, U-Turn, Queue Length
Subjects: 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil
Divisions: Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR
Depositing User: D4 TPJJ A 2024
Date Deposited: 29 Aug 2024 04:16
Last Modified: 29 Aug 2024 04:16
URI: http://eprints.polbeng.ac.id/id/eprint/14306

Actions (login required)

View Item View Item