Efendi, Syahrizan (2024) Prosedur Crew Change Bagi Crew Asing yang di Ageni Oleh PT Snepac Shipping Batam. Diploma thesis, Politeknik Negeri Bengkalis.
Text (Abstrak)
TA Syahrizan Abstrak.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (15kB) |
|
Text (Bab I Pendahuluan)
TA Syahrizan Bab I Pendahuluan.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (268kB) |
|
Text (Daftar Pustaka)
TA Syahrizan Daftar Pustaka.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (28kB) |
|
Text (Full Text)
TA Syahrizan Full Text.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (4MB) | Request a copy |
Abstract
This research aims to find out everything that happens in the process of foreign crew change at the Immigration Agency at PT.Snepac Shipping. The acquisition of data obtained based on observations in the field. In the management of foreign crew change, the agent gets power of attorney from the ship owner to take care of all the needs of the crew. The agent will prepare all the documents required by the foreign crew at the time of sign off and sign on, service while the crew is on the ship, pay attention to the crew documents on board, prepare all crew needs such as documents that must be submitted to the Immigration agency and take care of all the needs needed by foreign crews while in Indonesia. This research uses descriptive qualitative methods, data collection techniques by conducting field observations, interviews, and documentation. This research was conducted at PT Snepac Shipping Batam. The result of this research is that the crew change procedure for foreign crews at PT Snepac Shipping Batam agenti is still not going well, characterized by obstacles such as, requests for crew changes by ship owners delivered suddenly, so that the agents who serve the crew change have a short time. EPO process is ready filght ticket canceled and also when you want to sign in the management of EPO Dahsuskim head of immigration is often not in the immigration office this makes the delay in the management of EPO Dahsuskim.
Item Type: | Thesis (Diploma) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||||||
Uncontrolled Keywords: | SOP, Crew Asing, PT Snepac Shipping Batam | ||||||||||||
Subjects: | 900 RUMPUN ILMU LAINNYA | ||||||||||||
Divisions: | Jurusan Kemaritiman > Diploma Tiga Nautika > TUGAS AKHIR | ||||||||||||
Depositing User: | Nautika A 2024 | ||||||||||||
Date Deposited: | 04 Sep 2024 03:47 | ||||||||||||
Last Modified: | 04 Sep 2024 03:47 | ||||||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/14686 |
Actions (login required)
View Item |