Alfayed, Mhd. Jody (2019) Evaluasi Geometrik Jalan ( Studi Kasus : Jalan Desa Kelemantan - Desa Palkun Kecamatan Bengkalis ). Undergraduate thesis, Politeknik Negeri Bengkalis.
|
Text (Abstract)
15. TA - 4204151035 -ABSTRACT.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (101kB) | Preview |
|
|
Text (Bab I Pendahuluan)
2. TA - 4204151035 -BAB I.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (425kB) | Preview |
|
|
Text (Daftar Pustaka)
7. TA - 4204151035 -DAFTAR PUSTAKA.pdf - Submitted Version Available under License Creative Commons Attribution Share Alike. Download (293kB) | Preview |
|
Text (Full Text)
14. TA - 4204151035 -FULL TEXT.pdf - Submitted Version Restricted to Registered users only Available under License Creative Commons Attribution Share Alike. Download (17MB) | Request a copy |
Abstract
The regency road that exists between Kelemantan Village and Palkun Village has a type of pavement in the form of class B aggregate, the road will be constructed with a rigid pavement. In order for road works to be in accordance with the standards, it is necessary to evaluate the geometric conditions of the road, especially at several corners as well as visibility and pavement widening.This geometric evaluation uses the 1997 TPGJAK Method where the geometric shape of the road will adjust to the class and its function, namely the Class III Collector road, so that the resulting geometric road will provide smoothness, safety, and comfort for road users. Based on this evaluation, the existing road length condition is known that the road has a terrain classification as a flat area, a planned speed of 50 km/h and a road width of 6 meters. There are 6 bends with different types of bends. From the results of the analysis and calculation on this road obtained bends 1 and 2 have the type (S-C-S), while the bends 3,4,5,6 with the type (S-S).Superelevation at bend 1 (5.7%), bend 2 (2.0%), bend 3 (17.0%), bend 4 (15.2%), bend 5 (25.2%),bend 6 ( 19.3), and widening for bend 1 as wide as 2 m, bend 2 as wide as 1.35 m, bend 3 with width 4 m, bend 4 as wide as 2 m, bend 5 with 4 m, and bend 6 with widening 4 m.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Uncontrolled Keywords: | Horizontal Alignment, Bend Type, Superelevation | ||||||||
Subjects: | 410 ILMU TEKNIK > 420 TEKNIK SIPIL DAN PERENCANAAN TATA RUANG > 421 Teknik Sipil | ||||||||
Divisions: | Jurusan Teknik Sipil > Sarjana Terapan Teknik Perancangan Jalan Dan Jambatan > TUGAS AKHIR | ||||||||
Depositing User: | Editor Perpustakaan | ||||||||
Date Deposited: | 24 Mar 2021 10:55 | ||||||||
Last Modified: | 08 Feb 2023 11:06 | ||||||||
URI: | http://eprints.polbeng.ac.id/id/eprint/157 |
Actions (login required)
View Item |