Analisis Pencapaian Target Retribusi Penyewaan Alat Berat Pada Dinas Pekerjaan Umum Dan Penataan Ruang (PUPR) Kabupaten Bengkalis

Kurniawan, Lani (2021) Analisis Pencapaian Target Retribusi Penyewaan Alat Berat Pada Dinas Pekerjaan Umum Dan Penataan Ruang (PUPR) Kabupaten Bengkalis. Undergraduate thesis, Politeknik Negeri Bengkalis.

[img]
Preview
Text (Abstract)
1.TA-5304171102-Abstract.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (277kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
2.TA-5304171102-Bab I Pendahuluan.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (396kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
3.TA-5304171102-Daftar Pustaka.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.

Download (415kB) | Preview
[img] Text (Full Text)
4.TA-5304171102-Full Text.pdf - Submitted Version
Restricted to Registered users only
Available under License Creative Commons Attribution Share Alike.

Download (2MB) | Request a copy

Abstract

The purpose of this study was to determine the achievement of the target for heavy equipment rental levies (PUPR) in Bengkalis Regency, the target of heavy equipment rental at the public works and spatial planning office (PUPR) and obstacles in the heavy equipment rental levy at the public works and spatial planning office (PUPR). Bengkalis Regency. The type of data used in this study is qualitative data with a descriptive qualitative method approach. The results of this study indicate that (1) the target of PUPR in Bengkalis Regency is Rp.3.000.000.000 and with a total optimization of heavy equipment of Rp.3.392.000.000, so in 1 year PUPR must optimize heavy equipment rental with an income of 3.3 billion. (2) Bengkalis Regency PUPR heavy equipment rental income, precisely in January 2019, rental income with the highest percentage or graph of Rp.62.745.000 with an achievement target of 75.29%, among other months, because the one who rents heavy equipment at the Regency PUPR Workshop Bengkalis is still low (3) The levy for renting heavy equipment in Bengkalis Regency is still lacking in human resources, lack of heavy equipment, very high competition for heavy equipment rental, work results, and lack of utilization of heavy equipment owned.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsEmailNIDN/NIDK
Thesis advisorNurhazana, Nurhazananurhazana@polbeng.ac.idNIDN1015098003
Uncontrolled Keywords: Rental, Heavy Equipment, and Effectiveness.
Subjects: 550 ILMU EKONOMI > 560 ILMU EKONOMI > 562 Akuntansi
Divisions: Jurusan Administrasi Bisnis > Sarjana Terapan Akuntansi Keuangan Publik > TUGAS AKHIR
Depositing User: Users 297 not found.
Date Deposited: 24 Sep 2021 16:19
Last Modified: 24 Sep 2021 16:19
URI: http://eprints.polbeng.ac.id/id/eprint/1785

Actions (login required)

View Item View Item